
6 Technical Spezifications XHE
6.5 XHE Connectors
Status-LEDs:
Status:
blue -
during the initialisation phase
yellow-
the Rubidium has warmed up
green -
the Rubidium is synchronized
with the external PPS
PPS_In:
green -
PPS input from Rubidium is
locked to connected Clock
PPS_Out:
green -
PPS output from Rubidium
to connected clock is OK
Alarm:
red
-
internal error
(e.g. power supply)
——————————————————————
CLK-XHE-Connection
(to the connected receiver):
Connection Type:
7W2 D-SUB Combi female
Pin Assignment:
A1: PPS In
A2: PPS Out
Pin 1: SCL_Out (SPI Clock)
Pin 2: CS (Chip Select)
Pin 3: MOSI (Master Out, Slave In)
Pin 4: MISO (Master In, Slave Out)
Pin 5: GND
Attention:
Always use the supplied cable
to connect the Rubidium module to the receiver.
——————————————————————
USB:
USB Micro-B
(only for factory installation of firmware or
for use by authorized personnel)
Warning:
This USB plug is covered with a small plate at
delivery state. No devices (e.g. USB stick) may be connected to
this connector. Failure to follow this instruction will result in system errors.
Rubidium
Status
PPS _In
PPS _Out
Alarm
C
L
K
1
3
5
A2
A1
XHE-Rubidium
Date: 28th July 2020
15
Содержание XHE-Rubidium
Страница 1: ...MANUAL XHE Rubidium Holdover Extension 28th July 2020 Meinberg Funkuhren GmbH Co KG ...
Страница 2: ......
Страница 22: ......