71
Figure 45: CT Ratio Test Screen - Concurrent
11
Select the play button and a connection diagram will appear showing the proper connections for the
MRCT to the CT
Figure 46: CT Ratio Connection Diagram - Concurrent
12
Check all connections to ensure correctness
13
Hit Blue Play button
.
14
A dialog will appear requesting how much Voltage to apply to the CT during
the ratio test