64
11.
Select the play button and a connection diagram will appear showing the proper connections for
the MRCT to the CT
Figure 39: Saturation Connection Diagram - Concurrent
12.
Check all connections to ensure correctness
13.
Hit Blue Play button to begin test.
14.
The saturation test will begin.
X Voltage (V): The MRCT displays the real time voltage readings of the secondary X winding
while the test is in progress.
X Current (A): The MRCT the real time current readings for the secondary X winding while the
test is in progress.
Saturation Curve: The excitation curve is Log-Log curve with secondary current on X coordinate
and secondary voltage on Y coordinate. Saturation curves for all correlating taps will be graphed
in the chart in the right hand corner of the screen in real time as data is accumulated.
15.
At any point of time Test can be terminated by hitting the ABORT button at the top of the screen.