The dashes (or an old result) will flash until a new result
is displayed.
During the test, continuity indicators will fade and soft keys
will be inactive.
For bidirectional tests, the dashes (or the previous result)
and left hand arrow will flash while the instrument performs
a reading in the forward direction. When the forward
measurement is complete, it is shown next to the left hand
arrow, and then the right hand arrow and the dashes (or the
previous result) flash to indicate that the test current has been
reversed.
For unidirectional tests, the dashes (or the previous result) will
flash until a result is ready.
6.1.1 Post auto-start, unidirectional test:
After an auto-start, unidirectional test the C and P continuity
indicators will be grey if continuity was maintained.
This indicates the C or P lead must be disconnected
and reconnected to restart the test.
Note:
Test button will start another test.
Soft key 1 toggles continuous / single test.
Soft keys 2 / 3 cycles through current ratings;
default is 2 A, selectable 1 A, 100 mA, 10 mA, 1 mA.
Soft key 4 is inactive.
TICK button sets new reference value.
6.1.2 Post auto-start, bidirectional test:
After an auto-start, bidirectional test the C and P continuity
indicators will be grey. This indicates the C or P lead must be
disconnected and reconnected to start the next test.
If an auto-start test is interrupted by pressing the TEST button
C and P continuity indicator will turn grey. This indicates the C
or P lead must be disconnected and reconnected to restart the
test. Alternatively press the TEST button to start another test.
Continuity on C or P has been lost. Re-establish continuity to
start a new test.
Tests, Resistance mode
www.megger.com
DLRO2
21
Содержание Ducter DLRO2
Страница 1: ...DLRO2 Ducter Low Resistance Ohmmeter 2 A User Guide ...
Страница 7: ...Contents www megger com DLRO2 vii ...
Страница 46: ...Notes www megger com DLRO2 40 15 Notes ...