background image

13/12/2017 

   Gas Detection 

Gas Detectors 

IMPORTANT - Gas Detectors should not be installed until all building, construction or painting work etc.. Is completed, as these 
works can effect the sensitivity and longevity of the detectors. 

Ensure that the protective cover labels (

RED

) are removed only 

after the completion of all building work and the system has 
been commissioned by the Medem engineer. 
 
The labels are required to be removed for the detectors to 
operate, but removal before the completion of works risks 
contaminating the sensor element. 

The system is capable of operating a mix of up to 16 detectors (additional power pack may be required) of different types. 
 
The detector types are: 

• 

Carbon Monoxide. 

• 

Combustible gases (Methane, Propane).  

 
Detector location will vary dependant on the individual characteristics of the target gas that is being monitored for. See the gas 
detectors own instructions for more guidance.   
 

All current wiring regulations must be followed with reference to running low and mains voltage cables together. 

 

The maximum cable length between a detector and the control panel should not exceed 100 metres, if the distance between 
the main panel and the detectors is greater than 20metres a 1mm screened cable must be used on the +VE, 0v terminals 

 

Gas detectors, require a four core screened Belden type security cable or 600v rated BMS cable (max cable length of 
100meters.)  
Remote emergency stops and thermal links require a two core screened cable. 
Warranty will be void if Fire Protection Cable or cable over 1mm dia. is used on the SELV side 

AGDS-2em 

Detector Information 

+VE supply & Comm’s  

From either the main panel  

 

Address Selector 

The selector must be set to either 1 or 2. 

 

Detector 1 (

6&7

) = use address 1 

Detector 2 (

8&9

) = use address 2 

 
You must then enable detector 
monitoring for 1 & 2 using dip switch (

12

   Connection and addressing 

Status LED 

Содержание AGDS-2em

Страница 1: ...talled and commissioned to the satisfaction of the manufacturer A commissioning certificate must be issued to the end user along with instructions for the operation of the equipment As the Manufacture...

Страница 2: ...the High alarm Carbon Monoxide detectors are pre calibrated at 80ppm pre alarm and 100ppm for high alarm Connect a detector to either the detector 1 terminals 6 7 or detector 2 terminals 8 9 each det...

Страница 3: ...connection Reset 12 Enable Detectors Channels enable a channel when it has a detector connected 13 High alarm time delay function Controls the length of time between a High alarm and the closing of t...

Страница 4: ...t be followed with reference to running low and mains voltage cables together The maximum cable length between a detector and the control panel should not exceed 100 metres if the distance between the...

Страница 5: ...hould be wired in series with the EM stop buttons To EM Stop connections in the panel Indicator bar shows when pressed Normal EM Stop Activated Multiple Stop Buttons Single Stop Buttons Resetting indi...

Страница 6: ...that is being monitored for See the gas detectors own instructions for more guidance All current wiring regulations must be followed with reference to running low and mains voltage cables together Th...

Страница 7: ...g head height and between 1m and 3m from the potential source Care should be taken so they are not located close to the edge of a canopy or in direct flow of the supply or extract ventilation For addi...

Страница 8: ...plier Medem UK will exchange faulty valves for return to the manufacturer 5 Where a Medem UK engineer or another company appointed by Medem UK commission and installed system then that system will car...

Страница 9: ...ctor 1 or detector 2 on the panel 5 Enable the detector channels 1 or 2 as being used by with switch 12 Connect the 3 amp fused spur 240 volt supply to marked terminals 6 Once power is connected to th...

Отзывы: