Page 25
84RT Seres Speed Level™ - Operator’s Manual
July 2021
Fold Down Platform Railings
3084 Models
1
Open & Secure the Loading Gate
Remove the 2 snap pins that
hold the loading gate to the
side guardrail.
Swing the loading gate open
Secure the gate to the side
guardrail using one of the snap
pins.
Return the other snap pin to its
place.
•
•
•
•
ART_3137
ART_3138
2
Release & Lower the Entry Rail
Remove the 2 snap pins from
the top corners of the entry
guardrail.
Remove the 2 snap pins from
the base of the entry guardrail.
Lower the entry guardrail to the
platform floor.
Return the snap pins to their
places.
•
•
•
•
ART_3139
ART_3140
3
Release & Lower Left Side Rail
Remove the 3 snap pins from
the base the guardrail with the
loading gate.
Lower the guardrail and
loading gate to the platform
floor.
Return the snap pins to their
places.
•
•
•
ART_3141
ART_3142
4
Release & Lower Right Side Rail
Remove the 3 snap pins from
the base of the right side
guardrail.
Lower the guardrail to the
platform floor.
Return the snap pins to their
places.
•
•
•
ART_3143
To return the machine to normal operation mode:
Lift all rails into their upright position, then push down to secure them in their sockets
Install all spring pins and secure all gates
Position the platform control box on the right side rail at the front of the platform.
DO NOT
use the machine until all gates and guard rails are in position and properly secured.
•
•
•
Secton 9 - Fold Down Platform Ralngs
Fold Down Platform Railings