14
BULKHEAD UNION
(remove caps & install hoses)
3. Remove steel caps from the hydraulic bulkhead union fittings and install the supplied
hydraulic hoses (1/2” hose X 72” long with protective sleeving). A quick disconnect
needs to be installed on the end of the hoses. (this is not supplied due to the multitude
of quick disconnects available) The end fitting on the hydraulic hose is a dash 8 (-8)
male o-ring.
PROCESSOR INSTALLATION INSTRUCTIONS
SAFETY FIRST!! READ AND UNDERSTAND THE SAFETY INSTRUCTIONS
(pages 4-8 of this manual) BEFORE BEGINNING ANY PROCESSOR MOUNTING.
1. Place this product on a firm, level surface that is large enough to safely accommodate this
product, your power unit and all workers involved in the mounting process.
2. Be sure all connection points are properly secured.
3. Refer to the operator’s manual(s) for your power unit, loader and quick-attach and follow the
mounting instructions contained therein.
4. Carefully raise the loader arms and cycle the tilt cylinders to check clearances and to verify
that all mounting procedures have been successfully completed.
PROCESSOR HYDRAULIC CONNECTION
SAFETY FIRST!! READ AND UNDERSTAND THE SAFETY INSTRUCTIONS
(pages 4-8 of this manual) BEFORE BEGINNING ANY HYDRAULIC CONNECTION.
1. Attach the quick couplers to your power unit as per the instructions in your power unit’s
operator’s manual.
2. Carefully raise the loader arm and cycle the tilt cylinders to check hose clearances and to
check any interference.
3. Engage hydraulics & cycle machine forward and reverse for 2-3 minutes to ensure machine
is operating properly.