FIG.7
19 . Drill pilot holes on the wall, and insert the Plastic Screw Anchors (#29) into the hole.
See FIG 7A.
20. Assemble the Bottom Cue Rack (#30) and Top Cue Rack (#31) on the wall using
four Screws (#32).
See FIG.7.
FIG.7
FIG.7A
10
31
29
29
32
32
30
31
48inch
Left View
30
29
32
32