INSTALLATION

1. CEO63 Compressor 7.

2. Evaporator

Oil Pump

8.

3. Condenser

Oil Level Sight Glass

9.

4. Relief Valves

Discharge Line

10.

5. Control Panel

Hot Gas Bypass

11.

6.

Expansion Valve

Lube Box

FIGURE 8

T E H 0 6 3

12. Liquid Line Shut-Off Valve
13. Oil Cooler
14. Motor Liquid Cooling Line
15. Motor Terminal Cover
16. Discharge Check Valve

8

OPERATIVE AND PREVENT REFRIGERANT FROM
ACCUMULATING IN OIL.

The control center off-on switch should be turned to
the “Off” position any time compressor operation is

not desired.

If the control voltage is supplied by a transformer, the

transformer should be rated at 2 KVA, with an inrush

rating of 12 KVA minimum at 80% power factor and

95% secondary voltage. For control wire sizing, refer
to the N.E.C. article 215 and 310. In the absence of

complete information to permit calculations, the volt-
age drop should be physically measured.

Control Interlocks

Water flow interlock terminals are provided on the
control center terminal strip. See field connection
diagram in the Electrical Data or in cover of control
center for proper connections.

The purpose of the water flow interlocks is to prevent

compressor operation until both the source water and
condenser water pumps are running and flow is
proven.

9

Operation of the source water pump may be to cycle
the pump with the compressor or it may be operated
continuously. The hot water (condenser) pump nor-
mally will be run continuously. The holding coil of

the cooling tower pump motor starter must be rated at

115 volts 60 Hz with a maximum 25 volt-ampere rating.

All interlock contacts must be rated for no less than 10
inductive amps. The alarm circuit provided in the
control center utilizes 115 volts. The alarm used should

not draw more than 10 volt-amperes.

TESTING CONTROL CIRCUIT

The installing contractor should complete all field
connections to the Templifier control panel after which

he should check out all remote interlocks for proper
operation. Do not disturb the internal wiring of the

control center or change the factory settings of
operating and safety controls.

At the time of startup the McQuay Service Technician
will completely check out the power and control
circuits. Final power connections to the compressor
should be made only after the McQuay pre-startup

inspection.

Содержание Templifier

Страница 1: ...SINGLE AND DUAL COMPRESSOR CENTRIFUGAL TEMPLlFlER HEAT PUMPS 13600 Industrial Park Blvd P 0 Box 1551 Minneapolis Minnesota 55440...

Страница 2: ......

Страница 3: ...nameplate affixed with certain data for the installer including electrical data for the compressors and oil pumps MODEL STYLE SERIAL _ S O NO FACTORY CHARGED LBS REFRIGERANT _ LEAK TEST PRESSURE 100 P...

Страница 4: ...s to prevent damage to the control center and other components On units with side mounted compressors the unit can be lifted by the three corner fitting eyes and the extended eye at the compressor end...

Страница 5: ...AL OR FLANGE CONNECTIONS THE SOLID STATE TEMPERATURE SENSOR AND THERMOSTAT BULBS MUST BE REMOVED FROM THE WELLS TO PREVENT DAMAGE TO THOSE COMPONENTS Small water pressure test valves or pipe plugs are...

Страница 6: ...rop through the evaporator is greater or equal to the oil cooler pressure drop Under no circumstances should the oil cooler be piped in parallel with a single pass evaporator This will result in inade...

Страница 7: ...n practice for all installations NOTE Remove plastic thread protectors from the inside of the valves prior to making pipe connections Whenever vent piping is installed the lines should be run in accor...

Страница 8: ...an be determined by using GE No 546703265 phase sequence meter or equal Before connecting the starter load leads to the compressor terminals and while checking the field connection wiring the transiti...

Страница 9: ...ol center for proper connections The purpose of the water flow interlocks is to prevent compressor operation until both the source water and condenser water pumps are running and flow is proven 9 Oper...

Страница 10: ...OULD BE MAINTAINED ANY TIME REFRIGERANT IS ADDED OR REMOVED FROM THE SYSTEM CAUTION DO NOT USE OXYGEN TO BUILD UP PRESSURE AS A SERIOUS EXPLOSION CAN RESULT A pressure regulating valve should always b...

Страница 11: ...able and helpful in charging with that refrigerant Important At this point the charging procedure should be inter rupted and pre start checks made before attempting to complete refrigerant charge The...

Отзывы: