INSTALLATION
RECEIVING AND HANDLING
The unit should be inspected immediately after receipt
for possible shipping damage.
All McQuay Centrifugal Templifier Heat Pumps are
shipped F.O.B. factory and all claims for handling and
s h i p p i n g d a m a g e a r e t h e r e s p o n s i b i l i t y o f t h e
consignee.
Leave the shipping skid in place until the unit is in its
final position. This will aid in handling the equipment.
Extreme care should be used when rigging the equip-
ment to prevent damage to the control center, or
refrigerant piping.
On units with top mounted compressors, the unit can
be lifted by fastening the rigging hooks to the 4
corners of the evaporator where the rigging eyes are
located. (See Figure 2.) Spreader bars should be used
between the rigging lines to prevent damage to the
control center and other components.
On units with side mounted compressors, the unit can
be lifted by the three corner fitting eyes and the
extended eye at the compressor end. The center of
gravity is located approximately where the discharge
line enters the upper condenser shell. Adjust cable or
chain lenghs accordingly. The compressor support is
not designed to support the full weight of the unit.
Therefore, unit m u s t be lifted so that it is level or
canted to assure that the compressor supports leave
the ground first and touch down last. Spreader
bars are a must. (See Figure 3).
For equipment weights for rigging and installation
requirements, refer to the certified equipment data.
FIGURE 3
SIDE MOUNTED COMPRESSOR UNITS
1. Lifting Eyes 5. Source Water - In
2. Shipping Skid 6. Source Water - Out
3. Condenser Water - In 7. Control Center
4. Condenser Water - Out 8. Condenser Relief Valves
FIGURE 7.
TOP MOUNTED COMPRESSOR UNITS
Содержание Templifier