McHale
995 L+T
Square Bale Wrapper
68
13
Machine Maintenance
To maintain the
McHale
995 L+T
in good working order it is necessary to carry out
preventative maintenance regularly. The following section gives details of how this may
be carried out and how often it will be required.
13.1 Maintenance intervals
The following intervals should be adhered to, in order to ensure a long and efficient life
for the machine and maximum safety of personnel. They assume constant working
during the wrapping season.
First 5 working hours
Check all nuts and bolts for tightness and tighten, if necessary
Grease sub chassis pivots (No. 1)
Grease table tip hydraulic cylinder ends (No. 2)
Check all guards and safety devices (No. 3)
Check for any oil leaks and damaged pipes (No. 4)
Grease table roller cradle bearings (No. 1)
Grease cross shaft bearing (No. 2)
Grease dispenser top coil roller shafts (No. 3)
Grease cut and hold plunger (No. 4)
ENVIRONMENT: Health and safety rules re. environmental damage
It is vitally important to observe health and safety rules in order to avoid
unnecessary environmental damage or danger to anybody near the
machine. This especially applies to the responsible disposal of oil. Never
spill pollutants (oil, grease, filters, etc.) on the ground, never pour them
down the drain and never discard them where they can pollute the
environment. Always take waste materials to a recycling centre.