McCue Corporation
Walkway
Bollard
Installation Instructions
McCue Corporation | 35 Congress Street, Suite 150, Salem MA 01970
Phone: 800.800.8503 or 978.741.8500 | Fax: 978.741.2542 | www.mccuecorp.com
© 2010 McCue Corpotation
\\Mccue-san1\Shares\us\MKT\Intallation Instruction Source Files\CartStop\WalkWayBollard\WalkWay Bollard Installation Instructions.indd
Pg. 1
REV20100422
Tools and Hardware Required
Assembly
String Line or similar
•
Spirit or Bubble Level
•
Tape Measure
•
Marking Pen or Pencil
•
Appropriate Excavation Tools for
•
bollard hole
Concrete Mixing Tools including
•
water
80lb bag of 4000 psi Concrete
•
25lb bag of Sand
•
Damp Cloth
•
Check to ensure the WalkWay Bollard arrived fully
assembled and undamaged. A fully assembled
unit can be seen in
Figure 1
.
Bollard and Sleeve components are locked
together, DO NOT try to separate.
Discription
Quantity
Part Number
1 Walkway Bollard/
Sleeve Assembly
1
BOL-WALKWAY
In The Box
1. Layout
Identify the intended bollard location(s) using the Tape
Measure and String Line, and mark for excavation.
FRONT
REFLECTIVE
STRIP
BOLLARD
SLEEVE
RIVETS
BACK
FINISHED
FLOOR
LEVEL
GROUND
SAND
TOP EDGE
OF SLEEVE
FINISHED
FLOOR
LEVEL
TOP EDGE
OF SLEEVE
CONCRETE
SAND
GROUND
34 cm
[ 13.5 in ]
25 cm
[ 10 in ]
GROUND
FINISHED
FLOOR
LEVEL
GROUND
EXCAVATED
HOLE
SIDE
CUT-AWAY
TARMAC OR
CONCRETE
TARMAC OR
CONCRETE
TARMAC OR
CONCRETE
SLEEVE
FRONT
REFLECTIVE
STRIP
BOLLARD
SLEEVE
RIVETS
BACK
FINISHED
FLOOR
LEVEL
GROUND
SAND
TOP EDGE
OF SLEEVE
FINISHED
FLOOR
LEVEL
TOP EDGE
OF SLEEVE
CONCRETE
SAND
GROUND
34 cm
[ 13.5 in ]
25 cm
[ 10 in ]
GROUND
FINISHED
FLOOR
LEVEL
GROUND
EXCAVATED
HOLE
SIDE
CUT-AWAY
TARMAC OR
CONCRETE
TARMAC OR
CONCRETE
TARMAC OR
CONCRETE
SLEEVE
Check with site agents and managers before proceeding to ensure
they agree with the bollard location(s). If the floor is not finished,
enquire about the thickness of the finished ground-works, be it
tarmac, concrete or paving stones.
2. Marking & Drilling
Figure 1
Figure 1a