background image

 

  

 

 

Tidland Series 950/960 

Slitter Shaft 

Installation, Operation and Maintenance

 

 

 

EN 

 

Series 950 GK 
Series 960 GR  

 

MI 27L666264 1 J 

TIDLAND SLITTING SOLUTIONS 

Содержание Tidland 950 Series

Страница 1: ...Tidland Series 950 960 Slitter Shaft Installation Operation and Maintenance EN Series 950 GK Series 960 GR MI 27L666264 1 J TIDLAND SLITTING SOLUTIONS...

Страница 2: ...instructions marked on the product and on the PSDS if applicable 5 Inspect the shaft for wear and or other safety and functional deficiencies daily before each use 6 Wear safety glasses or proper eye...

Страница 3: ...when handling blades Do not operate the shaft when the elements are not inflated CUSTOMER SERVICE 1 360 834 2345 www maxcessintl com 1 800 426 1000 RECOMMENDED TOOLS Clean non lubricated air supply w...

Страница 4: ...umber available when you call VALVE JOURNAL RUBBER ELEMENT 135063 ELEMENT END CLAMP POCKET NON VALVE JOURNAL SOC HD CAPSCREW SHAFT BODY ELEMENT END CLAMP 132445 SOC HD CAPSCREW 132583 M5 X 16 mm AIR F...

Страница 5: ...rings Tidland recommends stainless steel gloves 3 Make sure that the shaft is clean and dry and that all screws securing the centering bars Series 960 GR only are present and tight Do not exceed 45 i...

Страница 6: ...the desired location 4 To lock anvil rings in place inflate shaft to 55 65 psi 3 8 4 5 bar Do not exceed maximum operating air pressure of 80 psi 5 5 bar 5 See your knifeholder manual for setup at ne...

Страница 7: ...ing 7 When slitter shaft is properly supported remove bearing 8 Remove anvil rings and spacers if applicable by sliding them off the shaft through the opening in the side frame 9 Leave the shaft in a...

Страница 8: ...rom Acetron GP Acetal a general purpose copolymer help ensure accurate positioning for your anvil rings Keep the bars and the shaft free from grit and scratches so that the anvil rings slide smoothly...

Страница 9: ...r leaks after replacing elements inflate shaft to operating pressure spray element end clamps with soapy water and check for bubbles There are many configurations for the Tidland Series 950GK 960GR sh...

Страница 10: ...f Loctite 222 to the end clamp screw threads and install the valve end clamp securing the element underneath it 8 Using 4 mm hex wrench tighten end clamp screws to 55 60 in lbs 6 21 6 77 Nm 9 At the n...

Страница 11: ...al of shaft journals Hoses may feed out the end of the shaft into the journal or out the side of the shaft depending upon the type of valve used Wrap a piece of tape around exposed hoses to prevent th...

Страница 12: ...valve from its side or end location in the shaft 2 Apply thread sealant according to manufacturer s instructions and install the valve Isolation Valve 3 way or 4 way End or Side Location 1 Remove set...

Страница 13: ...rm that the air fitting is connected to the internal air hose Check that the fitting is seated correctly in its hole Valve is leaking Access the valve and confirm that air hoses are attached If valve...

Страница 14: ...emove damage or deformities with 600 grit wet dry sandpaper Heavily damaged or deformed bars should be replaced Contact Maxcess 1 800 426 1000 Anvil rings will not fit on shaft Element end clamps exte...

Страница 15: ......

Страница 16: ...les maxcess eu www maxcess eu CHINA Tel 86 756 881 9398 Fax 86 756 881 9393 info maxcessintl com cn www maxcessintl com cn INDIA Tel 91 22 27602633 Fax 91 22 27602634 india maxcessintl com www maxcess...

Отзывы: