17
ASSEMBLY
STEP 4
| USER FRAME CABLE ASSEMBLY INSTRUCTIONS & NOTES
PART 3: CABLE ASSEMBLY
25
26
18
28
ID
DESCRIPTION
QUANTITY
18
M8 Flat Washer
4
25
M8 Nylock Nut
2
26
Cable Tie Rod End
2
28
M8 X 50L SHC
2
*Note: Image shows left arm assembly only, though quantities reflect both left and right arm assemblies.
Fully thread cable bolt into tie-rod, then attach to frame.
Torque M8 hardware to: 39 N-m/29 ft-lbs.
Содержание Versa Single-Station Strength
Страница 1: ...OWNERS MANUAL Versa Single Station Strength VS S23 Converging Shoulder Press ...
Страница 7: ...7 MARKINGS WARNING LABEL LOCATIONS ...
Страница 33: ......
Страница 34: ......
Страница 35: ......