
Summarizing tables
M
Z
024
English
6
138
Table 6.12:
Shiver SC
Table 6.13:
Shiver DC
Spring preload with external adjustment – Both legs
By turning the adjustment knob clockwise, you increase the preload value.
By turning the adjustment knob counterclockwise, you decrease the preload
value.
Rebound adjustment with external register – Both legs
When turning the adjuster clockwise, you increase the rebound hydraulic
braking, making the fork slower during the rebound phase.
When turning the adjuster counterclockwise, you decrease the rebound
hydraulic braking, making the fork more responsive during the rebound phase.
100
* the 8” brake system installation is allowed using an adapter provided by the brake system manufacturer
ø 20 mm through hole axle INTL STD 6" *
NO
T
V
Shiver SC
30mm
2,8" x 26"
Spring preload with external adjustment – Both legs
By turning the adjustment knob clockwise, you increase the preload value.
By turning the adjustment knob counterclockwise, you decrease the preload
value.
Rebound adjustment with external register – Both legs
When turning the adjuster clockwise, you increase the rebound hydraulic
braking, making the fork slower during the rebound phase.
When turning the adjuster counterclockwise, you decrease the rebound
hydraulic braking, making the fork more responsive during the rebound phase.
190
* the 8” brake system installation is allowed using an adapter provided by the brake system manufacturer
ø 20 mm through hole axle INTL STD 6" *
NO
T
V
Shiver DC
35mm
2,8" x 26"
Содержание BOMBER 2005
Страница 1: ......
Страница 2: ......
Страница 7: ...MZ024 no 49 Use and maintenance instruction manual Engli sh ...
Страница 58: ......
Страница 59: ...Cod 9001060 Maggio 2004 Ed 00 ...