Continuous Air Barrier Systems
−
Preparing the Opening
Figure 14: Preparing the opening.
The method shown below is Method A1 using a TYPE III flash pan. For step by step instructions on how to prepare
an opening using this method, refer to
www.marvin.com/ROprep
for instructions “Window Rough Opening Prep and
Flashing Method A1
−
Membrane Drainage System”. Refer to ASTM E2112
−
07 for other rough opening preparations
that are more appropriate for your situation.
12
Window Installation
StormPlus and Structural Installations
19970019
2012
−
04
−
10