Installation
1) Reverse removal sequence to install expansion valve noting
the follows.
Tighten specified torque to flared nut for expansion valve.
Tightening Torque for flared nut
Evaporator pipe
: 33 N·m (3.3 kg-m)
Evaporator joint pipe : 13 N·m (1.3 kg-m).
2) Evacuate and charge system according to previously-de-
scribed procedure.
A/C EVAPORATOR THERMISTOR
Check resistance between evaporator thermistor (1) terminals.
If check results are as not specified, replace thermistor.
Temperature
Removal
Refer to items REMOVAL and DISASSEMBLY in the section of
EVAPORATOR.
Installation
1) Reverse removal sequence to install thermister.
2) Evacuate and charge system according to previously described
procedure.
NOTE:
When the thermistor removed, it should be reinstalled in
original position.
1B-32
AIR CONDITIONING (OPTIONAL)
SH410
Sensor Temperature (
C)
Resistance (k
)
0
4.6 – 5.1
15
2.1 – 2.6
Содержание Zen
Страница 2: ......
Страница 233: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM SH410 ...
Страница 358: ... SH410 Prepared by Overseas Service Department 1st Ed January 2000 Printing January 2000 356 ...