PINION (PLUNGER) RETURN TEST
As a next step to the above, disconnect negative lead and check
to make sure that pinion returns inward quickly.
NO-LOAD PERFORMANCE TEST
Connect test leads as shown in left figure and check that motor
runs without fail with pinion moved out. Also check that ammeter
indicates specified current.
Specified Current: 50A at 11.5V
6G-12
CRANKING SYSTEM
Содержание 800
Страница 354: ...UNIT REPAIR OVERHAUL ENGINE ASSEMBLY REMOVAL AND INSTALLATION Refer to Section 6A ENGINE MECHANICAL F8D ENGINE 6A1 51 ...
Страница 396: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM ...
Страница 423: ...ENGINE AND EMISSION CONTROL SYSTEM 6E1 33 Blank ...
Страница 644: ...Prepared by Overseas Service Department 1st Ed October 1999 Printing 646 ...