
3
2624, 2624S, 2636, 2636S Griddle
INSTALLATION
FILLING BOILER WITH WATER:
CAUTION: MAKE SURE POWER IS OFF AND GRIDDLE IS COOL.
TURN OFF WATER SUPPLY:
Locate boiler water fill valve located front right of the griddle and remove caps (A & B). Locate purge valve
left back of griddle inside power head and remove caps (C & D). Detach existing water fill hose rear of
unit (F) and attach to boiler water fill located front right of griddle (A). Open valve; allow water to run until
water exits purge valve then close purge valve. Close fill valve. Turn water line at its source and disconnect.
Replace caps on all fittings.
Содержание 2624
Страница 6: ...4 2624 2624S 2636 2636S Griddle INSTALLATION ...
Страница 7: ...5 2624 2624S 2636 2636S Griddle INSTALLATION ...
Страница 13: ...11 2624 2624S 2636 2636S Griddle ILLUSTRATIONS 4 Griddle Power Head ...
Страница 17: ...15 2624 2624S 2636 2636S Griddle ILLUSTRATIONS 3 Griddle Bottom View ...
Страница 18: ...16 2624 2624S 2636 2636S Griddle ILLUSTRATIONS 2 Griddle Power Head ...
Страница 19: ...17 2624 2624S 2636 2636S Griddle ILLUSTRATIONS 2 Griddle Bottom View ...
Страница 20: ...19 2624 2624S 2636 2636S Griddle ILLUSTRATIONS Steam Generator Assy ...
Страница 23: ...22 2624 2624S 2636 2636S Griddle APPENDIX ...
Страница 27: ...26 FIG 2 Wiring Diagram 2600PHE OVEN TROUBLE SHOOTING GUIDE ...