
12 DECLARATION OF CONFORMITY
22
23
13 INSTALLATION REPORT
INSTALLATION REPORT
MARK Gekko Vario anchor point
Version (for technical details, see pp. 13–16)
Hollow concrete
Solid wood
Reinforced concrete
Engineered wood/
≥
CLT
Solid brick
Steel
To inspect
Inspected/OK
Installation base
Fixed
With sufficient static load-bearing capacity
Installation
Specified distance from edge observed
Prescribed screw-in depth acc. to instruction manual observed
Specified screws used
Any insulating layers or plaster coats taken into account
Photographs taken
MARK Gekko Vario
Securely anchored in installation base
No corrosion
No cracks
No deformation
Buckle can be opened by tapping it.
Buckle engages in the lock with little force.
Instruction manual
Available in full
Client
Responsible
party/contact
Signature,
company stamp
Contractor
Responsible
party/contact
Signature,
company stamp
Product
MARK Gekko Vario anchor point
Installation date
Batch number
(acc. to delivery note)
Comments:
Inventory number
Complete the installation report carefully!
Keep the installation report for future reference as per BauKG §8 !