The Advantage Series Installation
Page 20
MDE-3883 TRIND Retrofit Kits C00011-005
• 10/00
PRELIMINARY
FCC 11/30
Installing Cables
Position kit cables according to the following steps:
1
Carefully pry out printer cable retainer from underside of printer shelf.
2
Disconnect printer cable and pull cable out of 2 3/4" round hole from bottom, and
install piece of strip grommet Q10315-01 around perimeter of hole.
3
Feed three-prong end of power cable R20580-G1 and connector J250 end of
R20437-G01 ribbon cable up through hole and lay cable ends toward A side.
4
Reinstall printer cable and retainer disconnected and removed in step 2.
2 3/4” printer
cable hole
and cable
retainer
R20580-G1
R20437-G01
ribbon cable