4
To connect your PLC to the OIT
1.
Maple Systems produces PLC communications cables, which will connect the OIT to most of
the PLCs available. The cables can be manufactured to any length you may require. A listing
of all the PLC cables Maple Systems offers can be found on our website.
2.
If you have decided to make your own cable, make sure that it is wired correctly for your
particular PLC. Maple Systems provides cable wiring diagrams to guide you through the
construction of your cable. These can also be found on our website.
3.
Connect the PLC communications cable from the serial port on your PLC to the appropriate
serial port on your OIT.
• If you are us ing RS-232 com mu ni ca tions, then con nect the OIT end of the ca ble to the OIT
port la beled
PLC[RS-232]
.
• If you are using RS-485 communications, then connect the OIT end of the cable to the OIT
port labeled
PLC[RS-485]
. If you wish to use the Y-adapter programming cable, then
connect to the cable end that is marked
PLC
.
4.
Apply power to the PLC. The Silver Series OIT is programmed at the factory with a sample
demo that shows some features of the OIT. The OIT should display a sample startup screen.
The OIT will now accept a new project from EZware-500.
Starting EZware-500
Before you can create a sample project, you must start the configuration software. The EZware-500 software has
three main applications:
·
EasyBuilder
– used to create the project downloaded to the OIT.
·
EasyManager
- used to place the OIT into different operating modes.
·
EasyASCIIFontMaker
- used to edit the text fonts that display characters on the OIT.
4
To start the EZware-500 software
1.
From the Windows Task Bar, click the
Start
button, point to
Programs
, and then click the
EZware-500
folder.
2.
Click
EasyManager
to start the EasyManager application.
3.
Select the appropriate
COM port
on your computer.
4.
Select a baud rate of
38400.
After you have successfully downloaded a project to the OIT using this baud rate, try
using 115200 to decrease the required download time.
5.
Click
Project Download/Upload
.
6.
Click
Complete Download/Upload
.
After you have downloaded your first project to the OIT, you can switch to Partial
Download/Upload to decrease the required download time.
7.
On the EasyManager dialog box, click
EasyBuilder
.
8.
The Welcome to EasyBuilder
dialog box appears. Select the correct
OIT model
.
9.
Click
OK
to display the main screen of EasyBuilder.
If the main screen of EasyBuilder is displayed after you click
EasyBuilder
from the
EasyManager dialog box, select the correct model of OIT by clicking
New
from the File
menu.
1010-1001a, Rev 02
18
Sil ver Se ries In stal la tion & Op er a tion Man ual
Содержание Silver HMI504T
Страница 1: ...1010 1001A Rev 02...
Страница 20: ...1010 1001a Rev 02 16 Silver Series Installation Operation Manual OIT to PC Serial Port Pin Assignments...
Страница 32: ...1010 1001a Rev 02 28 Silver Series Installation Operation Manual...
Страница 128: ...1010 1001a Rev 01 124 Silver Series Installation Operation Manual...
Страница 156: ...1010 1001a Rev 02 152 Silver Series Installation Operation Manual...
Страница 166: ...1010 1001a Rev 02 162 Silver Series Installation Operation Manual...
Страница 216: ...1010 1001a Rev 01 212 Silver Series Installation Operation Manual...
Страница 251: ...1010 1001a Rev 02 Macros 247 Set Bit Objects Attributes Dialog Project Example of Add 2...
Страница 264: ...End Macro_Command 1010 1001a Rev 02 260 Silver Series Installation Operation Manual...
Страница 268: ...1010 1001a Rev 01 264 Silver Series Installation Operation Manual...