National Crane
Published 5-27-2018 Control # 039-06
1-37
800D
SAFETY INFORMATION
BOOM EXTENSION
To avoid death or serious injury, follow the procedures in this
manual during erection, stowage, and use of the boom
extension.
Install and secure all pins properly.
Control movement of boom extension at all times.
Do not remove right side boom nose pins unless boom
extension is properly pinned and secured on front and rear
stowage brackets.
Do not remove all the pins from both front and rear stowage
brackets unless the boom extension is pinned to the right
side of the boom nose.
Properly inspect, maintain, and adjust boom extension and
mounting.
When assembling and disassembling boom extension
sections, use blocking to adequately support each section
and to provide proper alignment.
Stay outside of boom extension sections and lattice work.
Watch for falling or flying pins when they are being removed.
PARKING AND SECURING
When parking on a grade, apply the parking brake and chock
the wheels.
The Controls and Operating Procedures section of this
manual provides instructions for parking and securing a
crane when it is to be left unattended. These instructions are
intended to allow the crane to be placed in the most stable
and secure position. However, National Crane recognizes
that certain jobsite conditions may not permit the boom and
boom extension of a crane to be fully lowered to the ground.
When a qualified person at a jobsite determines that it is not
practical to lower the boom to the ground, we recommend
the following additional instructions be followed:
•
The crane should be left in the smallest, most stable,
valid operational configuration that the job site
practically allows.
•
The crane can not be left running, with a load on the
hook, or in erection mode, or in wind conditions in
excess of allowed values.
•
The boom should be retracted as far as is practical, the
crane configured in as stable a configuration as possible
(boom angle, superstructure orientation, boom
extension angle, etc.)
•
In high winds the boom and boom extensions should be
lowered, or secured. Changing weather conditions
including but not limited to: wind, ice accumulation,
precipitation, flooding, lightning, etc. should be
considered when determining the location and
configuration of a crane when it is to be left unattended.
SHUT-DOWN
Use the following steps when shutting down the crane:
•
Engage the parking brake.
•
Fully retract and lower the boom.
•
Engage the swing lock pin and/or 360 degree swing
lock.
•
Place controls in neutral position.
•
Shut down the engine and remove the ignition key.
•
Chock the wheels, if not on outriggers.
•
Lock the operator’s cab (if applicable) and install vandal
guards, if used.
COLD WEATHER OPERATION
Cold weather operation requires additional caution on the
part of the operator.
Check operating procedures in this manual for cold weather
starting.
Don’t touch metal surfaces that could freeze you to them.
Clean the crane of all ice and snow.
Allow ample time for hydraulic oil to warm up.
In freezing weather, park the crane in an area where it
cannot become frozen to the ground. The drive line can be
damaged when attempting to free a frozen crane.
DANGER
Boom Extension Hazard!
To avoid death or serious injury, follow procedures in
Load
Chart
, safety, and operation manuals during erection,
stowage and use of boom extension. Install and secure all
pins properly and control boom extension movement at all
times.
WARNING
Tipping Hazard!
When parking the crane and leaving it unattended follow
the instructions for the Controls and Operating
Procedures of this manual.
Failure to comply with these instructions may cause death
or serious injury
!
Fo
r
Reference
Only
Содержание National Crane 800D
Страница 1: ...Operator and Service Manual National Crane 800D F o r R e f e r e n c e O n l y ...
Страница 4: ...F o r R e f e r e n c e O n l y ...
Страница 98: ...MAINTENANCE 800D 3 10 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 194: ...SPECIFICATIONS 800D 8 4 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 216: ...INSTALLATION 800D 9 22 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 232: ...CRANE INSTALLATION 800D 10 16 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 252: ...SCHEMATICS 800D 2 Published 5 27 2018 Control 039 06 F o r R e f e r e n c e O n l y ...
Страница 255: ...F o r R e f e r e n c e O n l y ...
Страница 256: ...F o r R e f e r e n c e O n l y ...