REPAIR
800D
6-20
Published 5-27-2018 Control # 039-06
At this time the second and first extendable sections should
extend and retract equally and bottom out against the stops
simultaneously.
234 and 432 cable balancing
Extension
1. Measure the extension gaps between the third and
fourth section and the second and third section.
If the extension gap between third and fourth section is less
than the extension gap between the second and third
section;
2. Tighten the
234
extend cable located at the back top of
the second section the difference in the extension gap
measurements.
3. Extend and retract the boom a few times and then
repeat measuring the extension gaps.
The fourth section should have moved out.
4. Tightening until the extension gap between the third and
fourth section is equal to the extension gap between the
second and third section.
Retraction
1. Measure the retraction gaps between the second and
third section and the third and fourth section.
If the retraction gap is greater between the third and fourth
section than the retraction gap between the second and third
section;
2. Tighten the
432
retract cable located at the front bottom
of the second section the difference in the retraction gap
measurements.
3. Extend and retract the boom a few times and then
repeat measuring the retraction gaps.
The fourth section should have moved in.
4. Tightening until the retraction gap between the third and
fourth section is equal to the retraction gap between the
second and third section.
At this time the all extendable sections should extend and
r e t r a c t e q u a l l y a n d b o t t o m o u t a g a i n s t t h e s t o ps
simultaneously.
3- Section Boom w/ 1 Stage Cylinder Cable Positioning
Cable Tightening Sequence 3 Section Boom
with (1) Stage Extend Cylinder
Boom must be in horizontal position when adjusting cable
tension (See Figure 6-4.) Retract boom fully ensuring
sections are bottomed out on section stops. Ensure all
sections are fully bottomed out and do not spring
back.(Reference Tensioning Setup Procedure)
321 and 123 cable balancing
Extension
1. Measure the extension gaps between the first and
second section and the second and third section.
If the extension gap between second and third section is less
than the extension gap between the first and second section;
2. Tighten
123
extend cable located at the back top of the
base section the difference in the extension gap
measurements.
8860-4
FIGURE 6-4
EXTEND CABLE
RETRACT CABLE
3RD SECTION
2ND SECTION
1ST SECTION
BASE
TIP
Fo
r
Reference
Only
Содержание National Crane 800D
Страница 1: ...Operator and Service Manual National Crane 800D F o r R e f e r e n c e O n l y ...
Страница 4: ...F o r R e f e r e n c e O n l y ...
Страница 98: ...MAINTENANCE 800D 3 10 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 194: ...SPECIFICATIONS 800D 8 4 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 216: ...INSTALLATION 800D 9 22 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 232: ...CRANE INSTALLATION 800D 10 16 Published 5 27 2018 Control 039 06 THIS PAGE BLANK F o r R e f e r e n c e O n l y ...
Страница 252: ...SCHEMATICS 800D 2 Published 5 27 2018 Control 039 06 F o r R e f e r e n c e O n l y ...
Страница 255: ...F o r R e f e r e n c e O n l y ...
Страница 256: ...F o r R e f e r e n c e O n l y ...