STRUCTURALS
CD5515-2/YB5515-2 SERVICE MANUAL
11-32
Published 1-20-2017, Control# 483-02
Installation
1.
Feed cable through the mounting bracket and jam nuts.
2.
Thread switch through mounting bracket.
3.
Thread nuts on switch.
4.
Thread switch up until it touches tab of mounting bracket
and LED is pointed away from the bracket.
5.
Tighten jam nuts against mounting bracket.
6.
Adjust bracket and/or switch to have 3 to 10 mm (0.12 to
0.38 in) gap between end of switch and outrigger beam.
7.
Connect switch cable to wire harness.
Removal
1.
Engage the parking brake and put blocks under the
wheels to prevent crane movement.
NOTE:
If outrigger proximity switches are installed,
disconnect them before removing the outriggers.
2.
Extend the outrigger. Disconnect rod of the horizontal
outrigger cylinder (12, Figure 11-26) from the outrigger
beam (7). Retract the horizontal cylinder.
3.
Lower the jack outrigger (6) just far enough to remove
the load on the outrigger beam (7).
4.
Stop the engine. With the ignition switch in the ON
position, actuate the outrigger switches in both
directions to release pressure in the hydraulic circuits.
Turn the ignition switch to the OFF position.
5.
Disconnect the two hydraulic lines for the vertical
cylinder (13) from the bulkhead elbow attached to the
frame.
6.
Use a hoist to remove the outrigger assembly from the
frame.
Disassembly
1.
Remove retaining ring (1, Figure 11-26) from either side
of mounting pin (5). Drive the pin out.
2.
Pull outrigger jack (6) from outrigger beam (7).
3.
Disconnect the hydraulic hoses from the vertical cylinder
(13). Remove the hoses.
4.
Remove retaining ring (1) from either side of mounting
pin (2). Hold the cylinder in position and drive out the
mounting pin.
Assembly
1.
Completely clean the outrigger beam and outrigger jack.
Use steam or a suitable solvent. Also, clean the slide
contact surfaces of the main frame.
2.
Install outrigger jack (6, Figure 11-26) over the vertical
cylinder (13). Align the cylinder rod with the mounting
holes in the jack outrigger. Install pin (5) and retaining
ring(s) (1).
3.
Lubricate the inside of outrigger beam box and the
outside of the jack outrigger with STP Oil Treatment,
“LUBAID NF”, or bronze anti-seize compound.
4.
Align and install the jack outrigger and cylinder into the
outrigger beam. Install pin (2) and retaining ring(s) (1).
5.
Install the hydraulic hoses to the vertical cylinder ports.
6.
Connect the outrigger proximity switches, if equipped.
Installation
1.
Lubricate the slide blocks inside the mainframe with STP
Oil Treatment, “LUBAID NF” or bronze anti-seize
compound. Use a hoist and install the outrigger
assembly into the main frame.
2.
Connect the hoses to the bulkhead elbows on the main
frame. Make sure the hoses are routed in the top center
of the outrigger beam and will not be damaged when the
outriggers are retracted.
3.
Connect the horizontal outrigger cylinder (12,
Figure 11-26) to the outrigger beam (7). Install pin (3)
and retaining ring(s) (4).
4.
Apply a thin layer of STP Oil Treatment, “LUBAID NF”, or
bronze anti-seize compound to the slide block contact
surfaces on the outrigger beam.
5.
Operate outrigger and check for correct installation. Stop
the engine. Check for leakage at the hose connections.
FIGURE 11-25
7955
1
2
3
4
Reference Only
Содержание Grove YB5515-2
Страница 1: ...Shuttlelift CD5515 2 Grove YB5515 2 Service Maintenance Manual R e f e r e n c e O n l y ...
Страница 2: ...This Page Blank R e f e r e n c e O n l y ...
Страница 12: ...TABLE OF CONTENTS CD5515 2 YB5515 2 SERVICE MANUAL TOC 8 This Page Blank R e f e r e n c e O n l y ...
Страница 292: ...R e f e r e n c e O n l y ...
Страница 293: ...R e f e r e n c e O n l y ...