SET-UP AND INSTALLATION
GRT880 OPERATOR MANUAL
4-12
Published 3-25-2020, Control # 643-04
12.
Using control pendant, extend middle stowage bracket
(10, Figure 4-20) until boom extension base section
anchor fittings align with boom nose attachment fittings.
13.
Remove attachment pins from stowage lugs on right
side of boom extension base section and install into
upper and lower right anchor and attachment fittings of
the boom extension base section and boom nose.
Secure each attachment pin with a retaining clip.
14.
Disconnect control pendant and replace caps.
15.
Remove lock hitch pin (13, Figure 4-20) securing boom
extension base section to the front stowage bracket
(5, Figure 4-20) on the boom base. Stow lock hitch pin in
the stowage holder underneath the stowage bracket and
secure with retaining clip.
16.
Raise boom slightly above horizontal.
17.
Extend boom until boom extension base section is clear
of the middle stowage bracket ramp (10, Figure 4-20)
and the front stowage bracket pins (14, Figure 4-20) on
front stowage bracket assembly (5, Figure 4-20)
18.
Slightly raise or lower boom to help control the boom
extension swing. Using rope attached to tip of the boom
extension base section, swing boom extension base
section in front of the boom nose until boom extension
base section anchor fittings engage with left side boom
nose attachment fittings.
19.
Install attachment pin into the upper left anchor and
attachment fittings of the boom extension base section
and boom nose. Secure attachment pin with a retaining
clip.
20.
Using the jack handle (4, Figure 4-14) stored on the left
side of the boom nose, extend boom extension
alignment jack (3, Figure 4-14) until the lower left anchor
and attachment fittings of the boom extension base
section and boom nose are aligned. Install attachment
pin and secure with retaining clip.
21.
Retract alignment jack to its original position. Return
jack handle to its stowed position on left side of the boom
nose.
22.
If required, erect the boom extension fly section by
performing the procedures under
Extension Fly Section, page 4-13
23.
Raise and lock the mast assembly (6, Figure 4-20) into
an upright position.
a.
Remove mast assembly pin from the stowed
position lug of the mast assembly.
b.
Raise the mast assembly and install pin in the
upright position lug.
c.
Secure with clip pin.
d.
Remove cable retainer pin and clip pin from mast.
24.
Lower boom and remove rope from tip of boom
extension base section.
DANGER
When erecting the boom extension base section, keep all
personnel and equipment clear of swing path.
Uncontrolled movement of the boom extension base
section can cause death, injuries, or damage to
equipment.
DANGER
Do not modify attachment anchors or fittings to allow
installation of the attachment pin.
DANGER
Do not attempt to erect the boom extension fly section
unless it was attached to the boom extension base
section during initial erection procedure.
FIGURE 4-14
8177-2
1
2
3
Item
Description
1
Boom Extension
2
Boom Nose
3
Alignment Jack
4
Alignment Jack Handle
4
Содержание Grove GRT880
Страница 1: ...Operator Manual Grove GRT880 8968 ...
Страница 4: ...THIS PAGE BLANK ...
Страница 10: ...TABLE OF CONTENTS GRT880 TOC 6 THIS PAGE BLANK ...
Страница 16: ...INTRODUCTION GRT880 OPERATOR MANUAL 1 6 Published 3 25 2020 Control 643 04 THIS PAGE BLANK ...
Страница 54: ...SAFETY INFORMATION GRT880 OPERATOR MANUAL 2 38 Published 3 25 2020 Control 643 04 8496 3 FIGURE 2 10 ...
Страница 166: ...SET UP AND INSTALLATION GRT880 OPERATOR MANUAL 4 24 Published 3 25 2020 Control 643 04 THIS PAGE BLANK ...
Страница 198: ...5 32 Published 3 25 2020 Control 643 04 MAINTENANCE AND LUBRICATION GRT880 OPERATOR MANUAL THIS PAGE BLANK ...
Страница 200: ...OPERATOR MANUAL GRT880 6 2 THIS PAGE BLANK ...
Страница 201: ......
Страница 202: ......