![Manitowoc Grove GRT8120 Скачать руководство пользователя страница 319](http://html.mh-extra.com/html/manitowoc/grove-grt8120/grove-grt8120_operators-manual_701202319.webp)
Grove
Published 3-22-2021, Control # 702-02
5-11
GRT8120 OPERATOR MANUAL
SET-UP AND INSTALLATION
5
Locking
1.
Remove A2B weight.
2.
(A) Remove cap (1) from switch.
3.
Pull lanyard (2) down.
4.
(B) Secure lanyard (2) in this position using cap (1). A2B
switch is locked (disabled).
Unlocking
NOTE:
Always remove the switch lock (enable) before
installing an A2B weight around the hoist rope.
1.
(A) Pull down lanyard (2) and remove cap (1). Switch is
unlocked (enabled).
2.
(B) Install cap (1) on A2B switch.
Checking Before Operation
Check the following electrical connections before operating
the crane to make sure the RCL system is properly
connected for the crane configuration.
Cranes With Main Hoist Only
If the crane is operated only with the boom and without boom
extension or lattice insert, no additional connections are
necessary. It must however be ensured that the A2B switch
weight is correctly mounted on the main boom hoist rope.
With even numbers of rope lines, the lifting limit switch
weight shall be attached to the “dead end” of the hoist rope.
With odd numbers of rope lines, the lifting limit switch weight
shall be attached to the rope line with the lowest operating
speed.
If the crane is operated with a main boom extension or lattice
insert, the connecting cable must be mounted between the
connector on the boom extension or lattice insert and the
connector on the main boom. The main boom A2B switch
weight must be disconnected and mounted on the extension
or fly section A2B switch.
Cranes with Main and Auxiliary Hoists
If the main boom extension or fly section is not used, the A2B
switch must be plugged into the connector on the main boom
DANGER
Two-Block Hazard!
To avoid death or serious injury, keep load handling
devices away from the tip of the boom or boom extension
when extending the boom and when hoisting up.
If the A2B switch is locked (disabled), the hook block
could hit the main boom head or extension. Never lock an
A2B switch when a hoist rope is installed to that
attachment.
FIGURE 5-10
8684-1
WARNING
Failure to reposition the A2B weight will prevent the A2B
system from functioning properly. No weight shall be
mounted on the A2B switch of the main boom when
working with the boom extension/lattice insert.
FIGURE 5-11
8684-2
Содержание Grove GRT8120
Страница 1: ...Operator Manual Grove GRT8120 ...
Страница 4: ...THIS PAGE BLANK ...
Страница 16: ...TABLE OF CONTENTS GRT8120 A 12 THIS PAGE BLANK ...
Страница 24: ...INTRODUCTION GRT8120 OPERATOR MANUAL 1 8 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 74: ...SAFETY INFORMATION GRT8120 OPERATOR MANUAL 2 50 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 182: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 52 Published 3 22 2021 Control 702 02 FIGURE 4 54 ...
Страница 184: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 54 Published 3 22 2021 Control 702 02 FIGURE 4 55 1a 1b 1c 1d 1e 1f ...
Страница 186: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 56 Published 3 22 2021 Control 702 02 FIGURE 4 56 1a 1b 1c 1d 1e 1f 1g ...
Страница 188: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 58 Published 3 22 2021 Control 702 02 FIGURE 4 57 ...
Страница 190: ...OPERATING PROCEDURES GRT8120 OPERATOR MANUAL 4 60 Published 3 22 2021 Control 702 02 FIGURE 4 58 ...
Страница 221: ...Grove Published 3 22 2021 Control 702 02 4 91 GRT8120 OPERATOR MANUAL OPERATING PROCEDURES 4 THIS PAGE BLANK ...
Страница 378: ...5 70 Published 3 22 2021 Control 702 02 SET UP AND INSTALLATION GRT8120 OPERATOR MANUAL THIS PAGE BLANK ...
Страница 440: ...GRT8120 OPERATOR MANUAL A 10 Published 3 22 2021 Control 702 02 THIS PAGE BLANK ...
Страница 447: ......
Страница 448: ......