![Manitowoc GROVE GMK5150L Скачать руководство пользователя страница 317](http://html.mh-extra.com/html/manitowoc/grove-gmk5150l/grove-gmk5150l_operating-manual_701194317.webp)
Driving modes and rigging for on-road driving
6.4 Rigging the main boom
Operating manual
3 302 709 en
6 - 35
GMK5150L
1
2
.0
1.
201
8
6.4.9
Transporting the main boom
Transport the main boom only on a separate vehicle which is of sufficient
size and has sufficient lifting capacity;
•
Always place the main boom onto a suitable packing!
•
Secure the main boom against slipping using the holding ropes.
•
Load the main boom in such a way that other road users are not put at
risk.
•
Load the transport vehicle in such a way that the weight is evenly
distributed.
•
Secure the connection lines so that they will not slip and be damaged
during transport.
6.4.10
Securing/releasing the derricking cylinder
(A) – Securing
•
Place the tightening belt (
1
) over the
derricking cylinder and fasten it onto the
holders (
2
).
•
Tighten the tightening belt so that the der-
ricking cylinder is secure within the support.
(B) – Releasing
•
Slacken the tightening belt (
1
) and remove it
from the holders (
2
).
•
Stow the tightening belt away.
S
Risk of damage to the main boom
Always place the main boom onto a suitable packing. If you lay the main
boom on its side, add-on parts will be damaged.
Содержание GROVE GMK5150L
Страница 1: ...Operating manual 3 302 709 en 12 01 2018 ...
Страница 6: ...12 01 2018 2 3 302 706 en Additional page GMK Blank page ...
Страница 8: ...31 08 2018 2 3 302 808 en Additional pages GMK Blank page ...
Страница 12: ...22 11 2018 4 3 302 834 en us Correction sheet GMK5150 GMK5150L Blank page ...
Страница 14: ...28 11 2018 2 3 302 839 en Additional pages GMK Blank page ...
Страница 16: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 18: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 20: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 24: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 30: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 32: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 36: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 42: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 45: ...Operating manual 3 302 709 en GMK5150L 12 01 2018 15 15 Index ...
Страница 46: ...3 302 709 en Operating manual GMK5150L 12 01 2018 ...
Страница 48: ...Overview 1 1 Accidents 1 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 50: ...Overview 1 4 Terms used 1 4 3 302 709 en Operating manual GMK5150L 12 01 2018 1 4 Terms used ...
Страница 52: ...Overview 1 4 Terms used 1 6 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 82: ...Overview 1 10 Identification 1 36 3 302 709 en Operating manual GMK5150L 12 01 2018 1 10 Identification ...
Страница 416: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 4 Operating manual GMK5150L ...
Страница 420: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 8 Operating manual GMK5150L Side panel ...
Страница 436: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 24 Operating manual GMK5150L ...
Страница 448: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 36 Operating manual GMK5150L Blank page ...
Страница 486: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 74 Operating manual GMK5150L Blank page ...
Страница 494: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 82 Operating manual GMK5150L Blank page ...
Страница 496: ...Operating elements for crane operation 9 1 Overview of the operating elements 9 84 Operating manual GMK5150L Blank page ...
Страница 610: ...Crane operation 11 1 Before operating the crane 11 20 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 612: ...Crane operation 11 2 Standard slewing range type 11 22 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 680: ...Crane operation 11 5 Crane operation with main boom 11 90 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 738: ...Crane operation 11 7 Working range limiter 11 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 778: ...Rigging work 12 5 Starting the engine for rigging 12 30 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 802: ...Rigging work 12 8 Outrigger operation 12 54 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 818: ...Rigging work 12 8 Outrigger operation 12 70 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 896: ...Rigging work 12 10 Rigging work on the main boom 12 148 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 906: ...Rigging work 12 11 Other rigging work 12 158 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1020: ...Index 15 2 3 302 709 en Operating manual GMK5150L 12 01 2018 Blank page ...
Страница 1039: ......
Страница 1040: ......