Manitowoc E-1100 Скачать руководство пользователя страница 1

 K00019 STACKING KIT E-1100 & G-1700 

                                                                        Installation Instructions 

 
Parts List: 
Item 

   Description 

   Quantity Part 

Number 

  1. 

Lower Ice Chute Weldment (one with insulation) 

6605514 

  2. 

Upper Ice Chute Weldment 

6605414 

  3. 

Front Chute Support 

6608614 

  4. 

Top Front Mounting Bracket 

6605614 

  5. 

Bottom Front Mounting Bracket 

6605714 

6.

 

Bottom Rear Mounting Bracket (Angle 

  ) 

6213314 

7.

 

Top Rear Mounting Bracket (90

 

) 2 

6213214 

8.

 

Water Shield Weldment 

6653414 

9.

 

Stabilizer Bracket 

6611814 

10.

 

#10-32 x 1/2 Machine Screw 

5027021 

11.

 

1/4-20 x 5/8 Hex Brass Machine Screw 

5031841 

12.

 

#10-24 x 5/8 Self-tapping Screw 

14 

5202053 

13.

 

#10-24 x 3/8 Self-tapping Screw 

5202103 

14.

 

#10-32 Hex Nut 

5429431 

15.

 

1/4-20 Hex Nut 

5429531 

16.

 

#8-32 Wing Nut 

12 

5489021 

17.

 

1/4 Split Ring Lock Washer 

5545111 

18.

 

#10 Split Ring Lock Washer 

5573163 

19.

 

Installation Instructions 

8001953 

20.

 

Locking Plate 

6236814 

21.

 

Foam Tape 

250” 

9202393 

22.

 

Corner Brace 

6604714 

 
Installation Instructions: 
 
1.

 

The K019 stacking kit is used for stacking two E-1100 machines, two G-1700 machines, or one E-1100 and one G-
1700 machine.  The bin must be leveled before proceeding to step 2. 

2.

 

INSTALLATION OF CORNER BRACE: 
A.

 

Remove foam tape, as shown on Illustration 1. 

B.

 

Remove seven screws on the top of the bin and locate corner brace, as shown in Illustration 1.  Secure with seven 
screws previously removed. 

C.

 

Use foam tape from kit around the perimeter of corner brace, as shown in Illustration 1. 

3.

 

INSTALLATION OF MACHINES: 
A.

 

See service manual for uncrating and inspection of both machines. 

B.

 

Remove top cover from lower machine. 

C.

 

Set machine carefully and squarely on bin. 

D.

 

Position water shield from kit, as shown in Illustration 2.  Apply foam tape on the perimeter and across partition 
panel, as shown in Illustration 2. 

E.

 

Set top machine carefully and squarely on bottom machine. 

F.

 

Remove front, back, and side panel on the evaporator end of both machines. 

 
 
 

 
Manitowoc Ice, Inc.                                                                                                                                                            

2110 South 26 Street, P.O. Box 1720, Manitowoc, WI  54221-1720 USA                                                                                                           8001953            
Telephone 920-682-0161, Fax - Sales:  920-683-7589, Service/Parts: 920-683-7585,  Other:  920-683-7879                                               Page 1 of 5 
Web Site - 

www.manitowocice.com

                                                                                                                                                            Rev. 05/11/01 

Отзывы: