60
Part Number: 000015431 Rev01 5/19
Sequence of Operation
QUETQUBE® MODELS
NOTE: The power button must be depressed and the water
curtain/ice dampers must be in place on the evaporator
before the ice machine will start.
INITIAL START-UP OR START-UP AFTER
AUTOMATIC SHUT-OFF
1. Water Purge
Before the compressor starts, the water pump and water
dump solenoid are energized to purge the ice machine of
old water. This feature ensures that the ice making cycle
starts with fresh water.
2. Refrigeration SysteI Start-Up
ce Machine Head Section:
The harvest valve(s), air pump(s) and liquid line solenoid
valve energize to equalize high and low side refrigeration
pressure. After 10 seconds the harvest valve(s) and air
pump(s) de-energize.
CVD Condensing Unit:
The low pressure switch closes and sends voltage to
the time delay relay. The time delay relay when closed
sends voltage to the contactor coil, which energizes the
compressor.
Содержание CVDF0600
Страница 1: ...Part Number 000015431 Rev01 5 19 QuietQube Series Ice Machines Technician s Handbook ...
Страница 2: ......
Страница 12: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 68: ...68 Part Number 000015431 Rev01 5 19 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 208: ...208 Part Number 000015431 Rev01 5 19 IF2100C 1 2 3 4 5 6 7 10 11 12 13 15 16 17 13 12 14 14 9 18 11 12 12 T4 T3 T1 T2 ...
Страница 210: ...210 Part Number 000015431 Rev01 5 19 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 211: ......