16000 WIND ATTACHMENT OPERATOR’S MANUAL
SET-UP AND INSTALLATION
4
Reeve Load Lines
Raise the boom until the extended upper boom point rollers
are about to lift off the ground.
Reeve the load lines as required. See Load Line Reeving
instructions in this section for proper routing and reeving of
the load lines.
Connect Boom Wiring
See Figure 4-23 for following procedure.
1.
Move wireless transceiver (6) from the boom top to the
boom cap (see Boom Wiring and Limits Assembly
Drawing at end of this section).
2.
Connect the electric cable from the cable reel in boom
butt to the wireless transceiver.
3.
Connect the electric cable between boom node
controller (5) in boom cap and wireless transceiver
(6)(see Boom Wiring and Limits Assembly Drawing at
end of this section).
4.
Install the block-up limit components. See the Boom
Wiring and Limits Assembly Drawing at end of this
section.
5.
Install the wind speed indicator assembly, if equipped.
Use star washers to attach the mounting bracket to the
extended upper boom point to provide a good ground.
See Wind Speed Indicator Assembly Drawing at the end
of this section.
6.
Install the aircraft warning light, if equipped. See Aircraft
Warning Light Assembly Drawing at the end of this
section
7.
Connect the electric cables from the load cell, the block-
up limit switches, the wind speed transmitter, the aircraft
warning light to proper receptacles on the boom node
controller.
8.
To protect electrical components:
a.
Attach protective caps to the ends of all unused
cables, unused receptacles, and unused terminator
plugs.
b.
If equipped, attach terminator plugs to unused
receptacles.
Perform Pre-Raising Checks
Perform the following pre-raising checks and correct any
defects before raising the boom:
o
Crane on firm, level surface.
o
Crawlers blocked if required per Capacity Chart.
o
All connecting pins installed and properly retained.
o
Boom inserts installed in proper sequence.
o
Intermediate suspension installed, if required, and
raised to proper length.
o
Boom straps installed in proper sequence.
o
All insert and strap connecting pins installed and
properly retained.
o
All luffing jib backstay straps, links, and pins removed
from boom sections.
o
Mast arms fully lowered.
o
Boom hoist wire rope spooled tightly onto drum and
engaged with proper sheaves. Wire rope securely
anchored to socket and wedge at mast.
o
Load lines spooled tightly onto drums and engaged with
proper sheaves. Load lines securely anchored to
sockets at boom points or at load block and weight ball.
o
All blocking, tools, and other items removed from boom.
o
Electronic boom angle indicator properly installed and
adjusted.
o
Block-up limit control properly installed and operational.
o
Rated Capacity Indicator/Limiter properly installed and
operational.
o
Proper capacity chart selected on configuration screen
of RCL display.
o
Automatic boom stop properly installed. Must be
adjusted after boom is raised.
o
Crane and attachment properly lubricated.
o
Wind within allowable limits for operation.
Содержание 16000WA
Страница 1: ...R e f e r e n c e O n l y Operator Manual Manitowoc 16000WA ...
Страница 2: ...R e f e r e n c e O n l y ...
Страница 4: ...R e f e r e n c e O n l y The original language of this publication is English ...
Страница 8: ...R e f e r e n c e O n l y ...
Страница 10: ...R e f e r e n c e O n l y ...
Страница 20: ...R e f e r e n c e O n l y ...
Страница 24: ...R e f e r e n c e O n l y ...
Страница 26: ...R e f e r e n c e O n l y ...
Страница 88: ...R e f e r e n c e O n l y C B A E D F D E F Upper Point 1 Part Upper Point 2 Part Lower Point FIGURE 4 37 ...
Страница 92: ...R e f e r e n c e O n l y ...
Страница 94: ...R e f e r e n c e O n l y ...
Страница 96: ...R e f e r e n c e O n l y ...
Страница 106: ...R e f e r e n c e O n l y ...
Страница 109: ...R e f e r e n c e O n l y ...
Страница 110: ...R e f e r e n c e O n l y ...