
4.1.10
Auxiliary jib
Fig. 14: Auxiliary jib
1
Bolting point
2
Lifting point
3
sheave
4.1.11
Heavy-duty jib
Fig. 15: Heavy-duty jib
1
Lifting point (changing the position of the diagonal tie)
2
Diagonal tie
3
Bolt, lifting point (assembly)
4
Fastening strap for the diagonal tie in the park position
5
Fastening on the boom
6
eye
Design and function
27.04.2020
140.5.204 Telescopic crane
125
Fo
r
Reference
Only
Содержание 140.5.204
Страница 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Страница 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Страница 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Страница 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...