Fire damper - FDMQ
Page 66
Version 2023-07-27
TPM 103/14
Installation frame E4
■
Installation frame E4 is designed for installation on:
■
Solid wall construction
■
Solid ceiling construction
■
Outside solid ceiling construction with concreting
■
Installation frame is equipped with an intumescent sealing on the inside. This sealing fills the gap between the damper
casing and frame in the event of a fire
■
Material:
■
Installation frame - cement-lime boards
■
Fasteners - galvanized steel
Installation frame E4
115
A+165
B
+
1
6
4
Ø
12