background image

Page 45

Version 2023-03-07

Fire damper - FDMQ 120

TPM 162/22

Hinge plates

2x

Ø

9

M8 t

o M

16

120

80

5

0

4x

Ø

9

M20

100

150

If in doubt, always consult an anchor specialist
engineer such as Halfen or Hilti.

1

Threaded rod M8 - M20

2

Nut M8 - M20

3

Washer for M8 - M20

4

Coupling Nut M8 - M20

5

Anchor

6

Hinge plate - min. thickness 10 mm

7

Concrete screw tested for fire resistance R30-R90,
max. Tension up to 0.75 KN (length 35 mm)

Load  capacities  of  threaded  rods  F  [N]  at  the

required fire resistance 90 minutes

Size

As [mm²]

Weight G [kg]

for 1 piece

for 1 pair

M8

366

22

44

M10

58

35

70

M12

843

52

104

M14

115

70

140

M16

157

96

192

M18

192

117

234

M20

245

150

300

Without anchor

With anchor

 Examples of anchoring to the ceiling construction

Follow the instructions of fixing specialist or installation company

With hinge plate and anchors

Screw  with  internal

thread and hexagon drive

The dampers must be suspended using threaded rods and
mounting  profiles.  Their  dimensioning  depend  on  the
weight of the damper.

The dampers and the duct must be suspended separately.

Following  air-conditioning  duct  must  be  suspended  or
supported so that all load transfer from the following duct

to  the  damper  flanges  is  absolutely  excluded.  Adjacent
duct must be suspended or supported, as required by the
duct suppliers.

Threaded  rods  longer  than  1,5  m  must  be  protected  by
fire insulation.

Mounting to the ceiling wall

Suspension systems

Содержание FDMQ 120

Страница 1: ...b sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mandik mandik cz FDMQ 120 Fire damper Technical Documentation Installation Commissioning Operation Maintenance and Service Manual TP...

Страница 2: ...and Installation 27 Statement of installations 29 Installation in solid wall construction 30 Installation outside solid wall construction 34 Installation in gypsum wall construction 36 Installation o...

Страница 3: ...structions Damper blade automatically closes air duct using a closing spring or a spring return actuator The closing spring is actuated by pressing a button on the manual control or by melting a therm...

Страница 4: ...tivation temperature 72 C has been reached Automatic initiation of the manual control is not activated if the temperature does not exceed 70 C In case that other activation temperatures are required t...

Страница 5: ...of protection IP 67 Working temperature 25 C 120 C Limit switch G905 300E03W1 This limit switch is possible to connect in two following ways CUT OFF if the arm is moving connect wire 1 2 SWITCH ON if...

Страница 6: ...per blade from the position OPEN to the position CLOSED takes maximum 20 sec In case that the power supply is restored again the blade can be in any position the actuator starts to rotate the damper b...

Страница 7: ...A 5 ms Protection class II III Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position...

Страница 8: ...I III Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position will be attained up to max...

Страница 9: ...III Degree of protection IP 54 Running time motor spring return 120 s 16 s Ambient temperature normal duty safety duty non operating temperature 30 C 50 C The safe position will be attained up to max...

Страница 10: ...s interrupted due to temperature outside the duct it is necessary to replace the spring return actuator Thermoelectric activation device BAT is integral part of the actuator If the thermal fuse Tf2 is...

Страница 11: ...nd 51 Design 41 with actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K and with supply device BKN 230 24 MOD voltage AC 230 V 1 2 3 4 5 6 7 1 2 S2 S1 S3 S5 S4 S6 2 3 4 5 6 1 BAT Tf Tf LED C...

Страница 12: ...ator is supposed to be controlled without any signal from the central it can be switched on by means of a bridge between the terminals 3 and 4 A green LED on BKN 230 24 is on when voltage is present i...

Страница 13: ...TION and FAILURE through 2 conductor wiring to the central Control command SWITCHED ON SWITCHED OFF from the central through BKN 230 24 C MP goes through the same wiring to the actuator To simplify th...

Страница 14: ...ith control systems using the Modbus RTU or BACnet MS TP protocol and smoke detector ORS 142 K The wiring of the line is to be carried out in accordance with applicable RS485 regulations Parameterizat...

Страница 15: ...with an external smoke detector Design 62 Communication and supply device BKN 230 24MP Nominal voltage AC 230 V 50 60Hz Power consumption 8 W including actuator Dimensioning 10 VA including actuator P...

Страница 16: ...d the safety relay opens and stays in this state even if the smoke disappears from the scanning chamber The sensor remains in the alarm state until the power supply is briefly reset On the pin 3 an ex...

Страница 17: ...ontrol and checks of fire dampers with the BF 24 TN ST BFL 24 T ST BFN 24 T ST actuator in conjunction with the BKN 230 24 supply and communication device BKS 24 1B receives information about the situ...

Страница 18: ...ts of the connected fire dampers It is possible to signalise functions such as the damper position and failure reports or to transmit them further to the system by means of integrated auxiliary switch...

Страница 19: ...casing 2 Spring return actuator 3 Damper blade 4 Inspection opening cover 5 Thermoelectric activation device BAT 6 Hole for camera FDMQ 120 with manual control 1 Damper casing 2 Manual control 3 Damp...

Страница 20: ...sing by the value a or c These values are specified in chapter Technical parameters see pages 21 to 26 Values a and c has to be respected when projecting following air conditioning duct Flange of a da...

Страница 21: ...13 0 0364 700 28 273 21 22 5 0 1270 315 80 5 12 13 5 0 0388 710 33 278 21 22 5 0 1290 355 100 5 13 14 5 0 0450 750 53 298 22 23 5 0 1370 400 123 14 15 5 0 0519 800 78 323 23 24 5 0 1470 450 148 15 16...

Страница 22: ...5 100 5 15 5 17 5 0 0798 800 78 323 29 32 0 2426 BF 400 123 17 18 5 0 0921 400 x 150 12 6 12 7 0 0319 BFL M1 450 148 18 21 0 1059 180 13 13 5 15 5 0 0431 500 173 19 5 22 5 0 1196 M2 200 23 14 15 5 0 0...

Страница 23: ...5 19 5 0 0661 500 173 25 5 28 5 0 2066 200 23 18 20 5 0 0776 550 198 27 30 0 2304 BFN 225 36 18 5 21 5 0 0920 560 203 27 30 0 2351 250 48 19 22 0 1064 600 223 28 5 31 5 0 2541 280 63 20 23 0 1236 630...

Страница 24: ...23 25 5 0 1341 600 223 36 39 0 3344 280 63 24 27 0 1559 M2 630 238 37 40 0 3531 300 73 24 5 27 5 0 1704 650 3 248 38 41 0 3656 315 80 5 25 28 0 1813 700 28 273 40 43 0 3969 355 100 5 26 5 29 5 0 2103...

Страница 25: ...273 47 50 0 5556 450 148 49 52 0 4716 BF M3 710 33 278 47 50 0 5644 500 173 47 5 50 5 0 5329 750 53 298 49 52 0 5994 550 198 50 5 53 5 0 5941 800 78 323 51 5 54 5 0 6431 M4 560 203 51 5 54 5 0 6064 10...

Страница 26: ...39 0 1991 550 198 58 5 61 5 0 7154 225 36 39 5 41 0 2360 560 203 59 5 62 5 0 7301 250 48 41 5 43 0 2729 BFN 600 223 62 5 65 5 0 7891 M4 280 63 44 45 5 0 3171 630 238 64 67 0 8334 M5 300 73 45 5 48 5 0...

Страница 27: ...llation and plastering process the actuating mechanism must be protected covered against damage and pollution The damper casing should not be deformed during bricking in Once the damper is built in th...

Страница 28: ...protected with fire fighting insulation If damper is installed outside a construction it is necessary to use reinforcing frame VRM Q 120 see page 57 Examples of fire damper installation X Built in ed...

Страница 29: ...0 ve i o S 30 Battery mortar or gypsum 31 32 Weichschott 33 Outside solid wall construction ISOVER Ultimate Protect Weichschott 34 35 In gypsum wall construction Mortar or gypsum 36 Battery mortar or...

Страница 30: ...Fixing profile with threaded rod see pages 45 to 48 5 Duct Solid wall construction mortar or gypsum EIS 120 X X 100 50 150 50 150 100 B min B 100 max B 300 A min A 100 max A 300 For connection followi...

Страница 31: ...te Protect SLAB 4 th 60 mm Solid wall construction 2 battery mortar or gypsum EIS 120 X Y 50 150 50 150 Y X 100 100 B min B 100 max B 300 2xA 60 min 2xA 60 100 max 2xA 60 300 min 2xB 60 100 max 2xB 60...

Страница 32: ...kg m e g ISOVER Ultimate Protect SLAB 4 th 60 mm 63 12 A B 29 X 100 Solid wall construction 4 battery mortar or gypsum EIS 120 X 50 150 min 2xA 60 100 max 2xA 60 300 2xA 60 B min 2xB 60 100 max 2xB 6...

Страница 33: ...equivalent 5 Duct 6 Protective cladding boards not part of the damper but must be used as part of the penetration filling It can be ordered from MAND K as an accessory e g PROMATECT MST th 30 mm min d...

Страница 34: ...ed separately for each installation case see page 57 Outside solid wall construction ISOVER Ultimate Protect Weichschott EIS 120 1 FDMQ 120 2 Solid wall construction 3 Weichschott e g Firestop Board H...

Страница 35: ...ER Protect BSK glue apply on the insulation and stick it to the fire separation construction 8 Fire resistant mastic fill the gap on both sides of the fire separation construction and around the perim...

Страница 36: ...s 45 to 48 5 Duct X X 100 50 150 Installation in gypsum wall construction Gypsum wall construction mortar or gypsum EIS 120 B min B 100 max B 300 A min A 100 max A 300 50 150 100 For connection follow...

Страница 37: ...te Protect SLAB 4 th 60 mm Gypsum wall construction 2 battery mortar or gypsum EIS 120 X Y 50 150 50 150 Y 100 min 2xB 60 100 max 2xB 60 300 2xB 60 A A min A 100 max A 300 A A A B C 100 50 150 B C X B...

Страница 38: ...kg m e g ISOVER Ultimate Protect SLAB 4 th 60 mm 63 12 A B 29 X 100 Gypsum wall construction 4 battery mortar or gypsum EIS 120 X 50 150 A A min 2xA 60 100 max 2xA 60 300 2xA 60 B min 2xB 60 100 max...

Страница 39: ...C or equivalent 5 Duct 6 Protective cladding boards not part of the damper but must be used as part of the penetration filling It can be ordered from MAND K as an accessory e g PROMATECT MST th 30 mm...

Страница 40: ...of installation VRM Q 120 is not a part of the fire damper and must be ordered separately for each installation case see page 57 1 FDMQ 120 2 Gypsum wall construction 3 Weichschott e g Firestop Board...

Страница 41: ...BSK glue apply on the insulation and stick it to the fire separation construction 8 Fire resistant mastic fill the gap on both sides of the fire separation construction and around the perimeter of pen...

Страница 42: ...to 48 5 Duct Installation in solid ceiling construction Solid ceiling construction mortar or gypsum EIS 120 X X 150 70 150 For connection following duct see page 49 This installation was tested withou...

Страница 43: ...with Gy proc CoreBoard between studs secured by Gypframe Retaining Channel 25mm Isover Acoustic Partition Roll APR 1200 in cavity optional Lining boards to non shaft side see table below Studs at 600m...

Страница 44: ...gypsum EIS 120 For connection following duct see page 49 Follow the instructions of the shaft wall producer All technical specifications and conditions can be found at www british gypsum com Maximum s...

Страница 45: ...7 96 192 M18 192 117 234 M20 245 150 300 Without anchor With anchor Examples of anchoring to the ceiling construction Follow the instructions of fixing specialist or installation company With hinge pl...

Страница 46: ...20 2 Threaded rod M8 M20 3 Support HILTI MQ 41 or MQ 41 3 or equivalent 4 Bored plate HILTI MQZ L or equivalent 5 Washer for M8 M20 6 Nut M8 M20 max 50 Dimension elements of the suspension system acc...

Страница 47: ...ickness 2 mm and min width 60 mm 8 Nut M8 with anchor 9 Screw with hexagon head 10 Installation holes 11 M6 bolt assembly bolt M6x10 nut M6 12 Gypsum grid from U profile Example of fixing FDMQ 120 to...

Страница 48: ...NDIK a s or sheet metal min thickness 2 mm and min width 60 mm 7 Nut M8 with anchor 8 Installation holes 9 M6 bolt assembly bolt M6x10 nut M6 Example of fixing FDMQ 120 to the ceiling In solid ceiling...

Страница 49: ...onductive connection 1 FDMQ 120 2 Duct 3 Extension piece if required 4 Damping pad 5 Steel clamp min M8 bolts 6 M8 bolt assembly bolt M8x20 mm 2 pcs large washer M8 nut M8 7 Seal 8 Lock washers M8 9 E...

Страница 50: ...DATA Pressure loss Pressure loss calculation Determination of pressure loss by using diagram 1 2 kg m3 p w2 2 p Pa presure loss w m s air flow speed in nominal damper section kg m3 air density coeffi...

Страница 51: ...9 0 219 750 0 354 0 330 0 321 0 309 0 286 0 271 0 260 0 246 0 238 0 230 0 222 0 219 0 215 800 0 344 0 320 0 309 0 297 0 282 0 264 0 251 0 239 0 229 0 221 0 215 0 211 0 209 A B 600 630 650 700 710 750...

Страница 52: ...44 1 47 3 49 5 51 3 52 7 53 9 54 9 55 8 56 6 59 8 62 63 8 65 2 67 4 69 2 72 8 74 5 7 48 2 51 3 53 5 55 3 56 7 57 9 58 9 59 8 60 7 63 8 66 1 67 8 69 2 71 4 73 2 76 8 78 6 8 51 6 54 8 57 58 8 60 2 61 4...

Страница 53: ...ock holder 1 lock lever 2 closing spring 8 dia stopper pin manual control pin 5 Inspection opening cover including the stirrup and fasteners if they are parts of the cover 6 Bearing for torque transfe...

Страница 54: ...hout direct weather impact there must not occur any shocks and ambient temperature must not exceed 50 C Dampers must be protected against impact when transported and manipulated During transportation...

Страница 55: ...rks done on the fire dampers must be done according international and local norms and laws All effective safety standards and directives must be obse rved during damper assembly To ensure reliable dam...

Страница 56: ...22 1 Damper 6 Thermal fuse 2 Mounting plate 7 Manual control 3 Sealing cover 8 Actuator 4 Sealing of a mounting plate 9 Thermoelectric activation device BAT 5 Mounting plate cover 10 Sensor sticker C...

Страница 57: ...8x60 mm hexagon head screws DIN 931 with M8 8 4 washers DIN 7349 3 Screw 5x60 mm screws into the predrilled holes 1 FDMQ 120 2 Part A of VRM Q 120 3 Part B of VRM Q 120 4 Hexagon head screw M8x60 mm D...

Страница 58: ...be achieved manually or automatically by applying the supply voltage It is recommended to provide periodical checks maintenance and service actions on fire equipment by authorized persons The authoriz...

Страница 59: ...s a part of function checks of the fire dampers at least 1x a year For the function checks the damper blade should be in CLOSED position with the fan off or with closed air regulation situated between...

Страница 60: ...41 With actuator BF 24 TN BFL BFN 24 T voltage AC DC 24 V 50 With actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K voltage AC DC 24 V 51 With communication and supply device BKN 230 24 an...

Страница 61: ...m The producer reserves the right for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mand...

Отзывы:

Похожие инструкции для FDMQ 120