background image

FLOOR LEVELING AND PLACEMENT

1. 

Place provided 4' level in desired location. Ensure that there are 

no gaps between the bottom of the level and the floor that are 
greater than 1/8", and that the site is level (the indicating bubble 
on the level should be between the center marks).  

 
2.

 Place Floor Pan in desired pod location.

 

3.

 Push down on Floor Pan at red arrow locations. 

The Floor Pan should be stable and not rock.
 
 
 

4.

 Place provided 4' Level in Floor Pan slots as shown and ensure 

that the floor pan is level. 

Page 5

4' LEVEL

**Note: If there's rocking, move the Floor Pan
a short distance to find a more stable location.

**Note: If the floor is not level, move the Floor Pan
a short distance to find a more stable location.

Содержание Solo

Страница 1: ...Solo Assembly Instructions For replacement parts questions or concerns contact 802 347 2111 customerexperience mamava com Version SM 1 04 14 2020 Page 1 People required 2 Average time required 2 hours...

Страница 2: ...Page 2...

Страница 3: ...ck Right Wall Panel and Shelf Page 8 Step 14 Step 15 Step 16 Step 17 Step 18 Header and Roof Pan Page 9 Step 19 Step 20 Step 21 Page 3 Table of Contents Wiring Roof Pan Page 10 Step 22 Step 23 Step 24...

Страница 4: ...OLO F102 PERF PAN SOLO F109 HEADER SOLO H100 SHELF SOLO I100 TOOLS REQUIRED 4 Level provided 6 Ladder Phillips Head 2 Screwdriver Philips Head 3 Drive Screwdriver provided Rotolock Allen Key provided...

Страница 5: ...ween the center marks 2 Place Floor Pan in desired pod location 3 Push down on Floor Pan at red arrow locations The Floor Pan should be stable and not rock 4 Place provided 4 Level in Floor Pan slots...

Страница 6: ...nge Screws with the teardrop holes in the Seat Posts 7 Fasten bottom of Seat to top of Seat Posts as shown 4 M8 X 1 25 X 25mm screws Page 6 SEAT POST A104 SEAT POST A104 SEAT E100 SEAT POST BRACKET A1...

Страница 7: ...ed allen key 10 Place Rotolock Caps over upper three holes 3 caps 11 Fasten Wall Panels to Floor Pan 4 M8 X 1 25 X 40mm screws 12 Fasten Wall panels to Seat Posts 4 M8 X 1 25 X 25mm screws 13 Fasten S...

Страница 8: ...g provided allen key 16 Place Rotolock Caps over upper three holes 3 caps 17 Fasten Back Right Wall Panel to Floor Pan 2 M8 X 1 25 X 40mm screws 18 Fasten Shelf to Back Right Wall Panel as shown 4 M8...

Страница 9: ...o roof opening by aligning the Roof Pan flanges within the slots on top of the Wall Panels 21 Fasten Roof Pan to Wall Panels as shown 12 M8 X 1 25 X 25mm screws Page 9 FRONT LEFT WALL PANEL D100 HEADE...

Страница 10: ...to Front Left Wall Panel Wire 23 Connect Roof Pan Wire Harness to Back Right Wall Panel Wire 24 Plug PCD Power Cord into PCD and flip up antennas Page 10 PCD PCD POWER CORD BACK RIGHT WALL PANEL WIRE...

Страница 11: ...on Box 28 Slide Beauty Panel under Seat and Rotolock into wall panels 29 Place Rotolock Caps over holes 2 caps 30 Plug in GFCI Plug on exterior of unit to wall outlet 31 Hold down the plunger switch l...

Страница 12: ...4 Pan head screws 33 Drop both Roof Caps onto Roof Pans as shown PCD antennas pass through holes in Roof Cap 34 Drop Perf Pan into center of Roof Caps fasten to Roof Pan underneath 4 M8 X 1 25 X 25mm...

Страница 13: ...d 37 Attach both door handles to door by snapping them into the exposed handle holes 38 Ensure that the door latches and that the handles are operable Page 13 TOP ARM MUST BE 90 TO CLOSED DOOR FASTEN...

Страница 14: ...nstallation Any installation changes and or requests submitted to Mamava post installation may be subject to service fees Signature Date Name Print Check Your Pod The door closes easily and freely wit...

Отзывы:

Похожие инструкции для Solo