background image

4. Machine description

4.1 Machine parts

MAKINA S7 PROPID

Image 1

1.

Cup warming tray. The water tank

under the the tray)

2.

Steam valve lever

3.

Pump pressure gauge

4.

Boiler pressure gauge

5.

Steam wand

6.

Control lamp red

7.

On/off switch

8.

Control lamp on/off green

9.

Hot water valve lever

10. E61 brew group
11. Hot water wand

12. Portafilter

13. Brew lever
14. PID

15. Drip tray

16. Water connection switch button

(under the machine on the left side)

17. Water connection switch valve

Right under the machine)

18. Water tank and direct water

connection switch.

Risk of injury
Danger of injury: The following parts are hot or may become hot:

Area around the valves

Steam and hot water wands

Brew group

Portafilter

Body (upper part and side frames)

Page 7

Содержание S7 PRO-PID

Страница 1: ...ina Espresso Machines Veemarkt 36D 1019 DD Amsterdam The Netherlands Contact us E info makinaespressomachines com W www makinaespressomachines com T 0031614577467 Company details KVK 62515152 BTW NL253855639B01 IBAN NL63ABNA0247389293 ...

Страница 2: ...onents and functions you need to make a perfect cup of espresso If you have further questions or if you require more information please contact us or your MAKINA authorized dealer before starting up the espresso coffee machine Please keep the instruction manual for future reference MAKINA espresso machines B V is not responsible for any damage caused by incorrect or unreasonable use and maintenanc...

Страница 3: ... with direct water connection 12 6 First use 13 6 1 Water tank machine or machine in use with water tank 13 6 1 2 Alarms 14 6 2 Machine in use with direct water connection 14 6 2 3 Alarms 14 7 Use of the machine 15 7 1 Standard use of the installed machine with water tank 15 7 2 Standard use of the installed machine with direct water connection 15 7 3 Adjustment of the brewing pressure 16 7 4 PID ...

Страница 4: ...e technicians which must be informed on the correct use of the machine if used in a way different from what indicated in its content or if any possible residual risks It has to be stored in a dry and clean place The instructions in this handbook are in no way a substitute for the safety instructions and technical data on the machine or the packaging concerning installation and function This handbo...

Страница 5: ...inal installation The installation technician must check the surrounding area to ensure safe and hygienic use are guaranteed The machine components manufacturers are responsible for the parts supplied by them The customer is responsible for the personal use of the equipment Do not expose the machine to environmental elements sun rain etc When the machine is idle and not in use for an extended peri...

Страница 6: ...nes dealer before starting up the espresso coffee machine The MAKINA ESPRESSO MACHINE S7 PRO PID complies with the relevant safety regulations Important You must use water with a hardness of max 4 dH to protect your machine against limescale damage If necessary use a water softener to achieve a sufficient degree of hardness A calcified machine may only be descaled by your specialized dealer becaus...

Страница 7: ... water valve lever 10 E61 brew group 11 Hot water wand 12 Portafilter 13 Brew lever 14 PID 15 Drip tray 16 Water connection switch button under the machine on the left side 17 Water connection switch valve Right under the machine 18 Water tank and direct water connection switch Risk of injury Danger of injury The following parts are hot or may become hot Area around the valves Steam and hot water ...

Страница 8: ...onnection 6 Power 1800 W Stable power supply 7 High quality copper boiler 3L 50 more capacity than the average espresso machines 8 Check valve Applied to the associated hydraulic circuit and automatic overpressure discharge system 9 Boiler over pressure valve 10 Full mirror polished high quality stainless steel exterior 11 Pre infusion function 12 Boiler pressure gauge 13 Pump pressure gauge 14 Wa...

Страница 9: ...ts In any case this device must always be installed on a fixed object and the use of cable extensions or loose connections is strictly prohibited Do not leave packing items such as plastic bags styrofoam nails etc around because children or other people could get hurt Any defect or discrepancy has to be notified immediately to the persons authorized for installation and maintenance of the machine ...

Страница 10: ...g a minimum clearance of 30 mm from walls Important PLEASE READ THE INSTRUCTION CAREFULLY BEFORE INSTALLING THE MACHINE IT IS IMPORTANT TO FOLLOW THE CORRECT PREPARATION STEPS BEFORE INSTALLING THE MACHINE Important The installation needs to be carried out by qualified specialists according to the following instructions and in compliance with valid laws and local regulations 5 2 Electrical connect...

Страница 11: ...tion for operating the machine with water tank facing the rear of the machine Image 3 Turn the switch under the machine into position 0 5 3 2 Machine in use with direct water connection When using the machine with direct water connection please turn the valve to the front side of the machine image 4 Place the switch under the machine into position 1 image 5 Image 5 Valve in position for operating ...

Страница 12: ...cialized dealer Make sure that the machine is on a water resistant surface in case of water spillage or leakage Make sure that the fixed water connection of your machine is connected to a potable water supply having an operating pressure ranging between 0 and 1 5 bars We recommend to use a pressure regulator and a shut off valve in case the operating pressure exceeds 1 5 bars or frequently fluctua...

Страница 13: ...position 3 Connect the machine to an appropriate power outlet through the power supply cable 4 Turn the power switch to position I The machine is now on 5 The green signal lamp lights up 6 The pump will fill the boiler of the machine with fresh water 7 As soon as the boiler is filled the pump will stop As soon as the fresh water falls below a certain level in the water tank the machine switches of...

Страница 14: ...ow on 4 The green signal lamp lights up The pump begins to fill the boiler of the machine with fresh water 5 As soon as the boiler has filled no more pump noise will be heard the machine will heat up automatically 6 Wait until the boiler pressure gauge indicates approx 1 0 1 3 bar or a temperature of 120 C 248 F has been reached 7 Move the group lever into the upper position and dispense approx 50...

Страница 15: ...nd When the machine is switched off more hot water can be dispensed Risk of injury All refill and cleaning procedures must be carried out with a machine disconnected from the power source The manufacturer accepts no liability for injury and damage to persons or property caused by incorrect installation and or use of the machine 7 2 Standard use of the installed machine with direct water connection...

Страница 16: ...e carried out by expert specialists 7 4 PID display function The PID control allows you to program the boiler temperature inside the boiler so you can modify the extraction temperature of the coffee from the brew group We recommend a temperature setting on the PID of 120 C at about 1 2 bar which corresponds to an outlet temperature of about 91 C If the temperature is set lower there will not be en...

Страница 17: ...rounds Image 8 Reference line for the desired ground coffee in your basket Important Do not leave the lever in intermediate position to prevent malfunction of the brew group 7 6 Dispensing of hot water 1 To deliver water into a jug pot or cup push down the hot water valve lever until reaching the desired amount of water 2 Put the hot water valve lever to its original position Risk of injury Ensure...

Страница 18: ... during using them Don t touch them with your hands without protection 8 Cleaning and maintenance Cleaning the machine is not the most fun thing to do Cleaning the machine is very important to the performance life and safety of your machine 8 1 Daily 1 Clean the nozzle of the steam pipe from the milk residue daily by wiping the nozzle with clean non abrasive damp cloth 2 Clean the portafilter filt...

Страница 19: ...ace it with the regular filter Finally prepare one coffee to remove residual detergent taste 8 3 Monthly Please refresh the boiler water once every month by extracting hot water from the hot water wand Important The machine can only be dismantled by an authorized technician A calcified machine may only be descaled by your specialized dealer because a partial disassembly of the boiler and the tubin...

Страница 20: ...position for operating the machine with direct water connection facing the front of the machine The machine does not stop working when there is no water in the tank and takes in air Machine in use with a water tank but switch in position I position direct water connection Switch to position 0 position water tank connection Coffee dregs are wet 1 Coffee grinding is too fine 2 Group is still cold 3 ...

Отзывы: