Majestic Napoli Скачать руководство пользователя страница 1

Napoli Installation Guide - Surface Profiles

 

1

 

The Majestic Shower Company Limited

 

17 Flitch Industrial Estate, Chelmsford Road, Dunmow, CM6 1XJ

 

 

Tel44 (0) 8448 001 500

 

Fac44 (0) 1279 635 074 [email protected] www.majesticshowers.com

 

 

 

 

Thank you for purchasing this Napoli shower screen. Please study these instructions 
carefully before assembly and installation.

 

Checking of Parts

 

Parts are listed at the beginning of this guide. Please check all supplied parts immediately 
and contact the Majestic Shower Company in the event of any missing or damaged parts.

 

These instructions are for left and right-handed units. All parts are reversible.

 

Handling of Parts

 

When handling glass, use suction glass lifters and take care to ensure that corners or edges 
are not knocked. Do not place glass on hard surfaces - place cushioning material under- 
neath to prevent the glass from shattering.

 

Unwrap all metal parts carefully to prevent damaging the plated surfaces.

 

Pre Installation Checks

 

Prior to undertaking installation, check the accuracy of the following against specifications 
for the particular installation location:

 

- Verticality and flatness of walls. Where wall profiles are used, some lean in or lean out of 

the wall relative to the floor or tray can be accommodated (+/- 9mm if 24mm profile is used,

 

+/- 5mm if 17mm profile is used). Walls must be substantially flat.

 

- Levelness and flatness of the floor or tray. Where a profile or underframe is used under- 

neath a glass panel, any minor hollows in the mounting surface must be solidly packed to 
prevent deflection under the weight of the glass as this may over stress the glass.

 

Installation Tips

 

The general principle of assembly is to assemble parts in the steps shown - first a dry 
assembly to check fits or mark cutting or drilling positions and then a final assembly with 
silicone.

 

When cutting aluminium extrusion, wrap the profile with masking tape first and cut through 
the taped area - this will help protect the surrounding surface. Use a fine file to smooth cut 

edges

.

 

If anti-calcium glass has been specified, the treated side of the glass will be indicated and 
should always face inwards towards the wet side of the shower area.

 

 
 

  

DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS

 

Содержание Napoli

Страница 1: ...on check the accuracy of the following against specifications for the particular installation location Verticality and flatness of walls Where wall profiles are used some lean in or lean out of the wa...

Страница 2: ...ge side 1 x Glass In Line Panel handle side 1 x Glass Door 2 x Glass to Glass Hinge assemblies with rubber packing strips 4 x Glass to Wall Bracket assemblies with wall plugs and screws 1 x 10mm Space...

Страница 3: ...licone along the underside of the Underframe as shown and apply enclosure will fit into the aperture within its adjustment tolerances allowing for any lean of the wall on the panel side Mark where the...

Страница 4: ...lign the vertical wall profiles at each end of the Underframe Push the wall profiles down as far as they will go and use a 2 metre spirit level to ensure that they are plumb vertical Mark the screw fi...

Страница 5: ...ct length which is equal to the width of the glass Door plus 8 mm clearance for vertical seals Position the In Line panels so that the Underframe Insert fits snugly between them Use a spirit level to...

Страница 6: ...eful not to damage the face plates With the clear plastic gaskets inserted both sides of the glass and wall screw plates facing inwards align the brackets centrally to the slots in the glass panels ho...

Страница 7: ...m in place Apply a generous amount of silicone on the inside of the channels where they meet in the corners to prevent water penetration 10 Ensure that the rubber strip is in place in the underframe c...

Страница 8: ...the door is correct and that the clear plastic Underframe Insert fits snugly between the In Line panel and the wall over the full height of the door aperture 12 To prevent leakage around the Glass to...

Страница 9: ...lace the hinges and their face plates either side of the hinge slots on the In Line panel with screws facing inwards Ensure that each face of the glass is separated from the hinges by a gasket Loosely...

Страница 10: ...lf adhesive rubber strip in each door hinge slot as shown Position the door mounting blocks in the underframe channel as shown and lift the door on to the blocks 16 Position the hinges centrally in th...

Страница 11: ...l seal is to be cut in 3 sections to fit to the edge of the In Line panel above below and between the hinges For maximum resistance to leakage the seal sections should be cut as shown above to allow t...

Страница 12: ...nds of the deflector blade back so that they clear the vertical Glass to Glass seals which should run down to the top of the Underframe 20 Push the underframe insert into the underframe channel under...

Страница 13: ...com www majesticshowers com 21 If you have the Finger Pull handle option the door will be supplied with the handle pre fitted as shown 22 Alternatively if you have a back to back handle fit this to th...

Страница 14: ...e enclosure 24 Adjust the bias on the hinges using the 2 small grub screws on the inside and outside of the hinge For an outward opening door the two grub screws on the outside of each hinge should be...

Страница 15: ...csimile 44 0 1279 635 074 info majesticshowers com www majesticshowers com 25 Using a smear of silicone fit the chromium screw covers provided to the wall bracket screws and the cover plates to the wa...

Отзывы: