
6. Preparations for mounting | gb
29
Power consumption:
Level 1
2.0 W
Level 2
2.4 W
Level 3
2.9 W
Level 4
3.7 W
Level 5
4.8 W
Sound level
15-37 dB(A)
Min. wall thickness
270 mm
Max. wall thickness
500 mm
Min. hole diameter
220 mm
Ventilation unit diameter
200 mm
Weight
8 kg
The unit version is stated on the rating
plate.
For dimensions and characteristic curves,
see catalogue and/or website
(maico-ventilatoren.com)
6.
Preparations for mounting
6.1 Requirements at the installation
site
Installation is only permitted:
in rooms with an ambient temperature
●
from -15 ...+40°C.
on an external wall with sufficient load
●
bearing capacity.
with 1° to 2° incline in the direction of
●
the external wall.
with max. cable lengths of 20 m
●
between room air control and ventilation
unit.
6.2 Mounting sequence
During the building phase:
Install wall insulation sleeve [Chap. 7.2]
●
Fit recess-mounted double socket for
●
room air control [Chap. 7.3].
Fit soffit element if PushPull 60 KL-SR is
●
being used [Chap. 7.4].
Route empty tubes for J-YSTY cables,
●
0.8 mm, 4 wires from room air control to
ventilation units. One cable is needed
per ventilation unit. For position of cable
feedthrough, see next page.
Once the external plastering is
complete:
Fit external cover if PushPull 60 KA-SR
●
is being used [Chap. 7.5].
Once internal plastering and painting is
complete:
Install frame of internal cover and PP 60
●
K-SE ventilation unit [Chap. 7.6 and 7.7]
Fit RLS PP-K room air control and
●
connect [Chap. 8].
6.3 Dimensions
Dimensions of internal cover and
internal cover frame [mm]
PP 60 K-SE
Cable feedthrough