
7 Installation
32
6. Seal front cover to exterior wall with perman-
ently elastic and weatherproof sealant (arrows
S2). Suitable sealing material is to be supplied
by the customer.
7.2.3 Installation of external covers PPB 30 AK
and PPB 30 AE / PPB 30 AW / PPB 30 AS
(once exterior wall is fully plastered)
Position of the external cover and wall sleeve
→ Use drilling template!
1. Remove plaster protective cover, place drilling
template over the wall sleeve, align it and
mark the fixing holes. Observe the “TOP” posi-
tion.
2. Drill the holes and insert dowels.
3. Remove front cover from housing.
PPB 30 AK
: Push onto the two locking levers
below.
PPB 30 AE / PPB 30 AW / PPB 30 AS
: Re-
move the screws on both sides. Then, remove
the front cover upwards.
D
Sealing strip
G
Housing
S
Silicon ring
4. On the side of the housing facing the wall, at-
tach a silicon ring [S] around the entire hole to
seal it off from the wall.
G
Housing
5. Screw housing to exterior wall with 4 screws.
Suitable mounting material is to be provided
by the customer.
NOTICE: Lack of air if housing is not fitted
tightly on the exterior wall. When fitting the
housing, ensure that the back side of the sil-
icon ring is flush and lies close to the exterior
wall.
7.3 Front cover
7.3.1 PPB 30 AK
NOTICE: Lack of air if the front cover insulat-
ing mat does not lie close. The insulating mat
must lie flush/close to the housing edge.
Содержание PP 45 RHK
Страница 3: ...Steuerungskonzept PP 45 3 Steuerungskonzept PP 45...
Страница 4: ...Steuerungskonzept PPB 30 4 Steuerungskonzept PPB 30...
Страница 22: ...PP 45 control concept 22 PP 45 control concept...
Страница 23: ...PPB 30 control concept 23 PPB 30 control concept...
Страница 41: ...Concept de commande PP 45 41 Concept de commande PP 45...
Страница 42: ...Concept de commande PPB 30 42 Concept de commande PPB 30...
Страница 59: ...Notizen...