
6 Preparation for installation
27
5.3 Number of ventilation units
Combinations
Quantity
Ventilation units
Ventilation units
PP 45 O
/
PP 45 K
+
Room air control
RLS
45 O
/
RLS 45 K
Up to 3 additional
RLS
45 K
permitted
Max. of 6
PP 45
units (3
x 2 unit pairs).
From star point, 25 m
cable connection length
to
PP 45
unit. Up to star
point, max. 4 m
Ventilation units
PP 45 O
/
PP 45 K
+
Power unit
PP 45 LT
Up to 3
PP 45 LT
per-
mitted
Max. of 6
PP 45
units (3
x 2 unit pairs) per
power unit.
From star point, 25 m
cable connection length
to power unit. Up to star
point, max. 4 m.
PP 45 RC
units (wire-
less)
Only operate
PP 45 RC
units in pairs, any num-
ber of pairs*. Observe
ranges.
Ventilation units
PPB 30 O
+
Room air control
RLS 45 O
/
RLS 45 K
3
PPB 30 O
or 2
PPB
30 O
+
2
PP 45 O
/
PP 45 K
or
1
PPB 30 O
+ 4
PP 45
O
/
PP 45 K
Set up unit pairs for
PP
45
units, if possible.
From star point, 25 m
cable connection length
to
PPB 30
-/
PP 45
unit.
Up to star point, max. 4
m.
Ventilation units
PPB 30 K
+
Room air control
RLS
45 K
or
Power unit
PP 45 LT
3
PPB 30 K
or 2
PPB
30 K
+ 2
PP 45 O
/
PP
45 K
or 1
PPB 30 K
+ 4
PP 45 O
/
PP 45 K
Set up unit pairs for
PP
45
units, if possible.
From star point, 25 m
cable connection length
to power unit. Up to star
point, max. 4 m.
* Can be used as a stand-alone unit with an ex-
terior wall air opening (ALD) for volumetric flow
compensation.
6 Preparation for installation
Installation information
•
PP 45
units are only suited for supply air rooms.
•
PPB 30
units are the ideal choice for exhaust
air rooms.
• Observe minimum spacing.
• Ensure sufficient space to work in front of the
unit → filter change.
• The customer should provide appropriate
mounting material for mounting the wall sleeve
and external cover.
• Core hole diameter DN 162. To ensure that
condensate is removed via the external cover,
the core drill hole should have a 1 to 2 % incline
to the exterior wall.
Recommendation: For substrates that are
difficult to substrates, e.g. reinforced concrete
and/or with and/or if the inclination cannot be
realised during the drilling process, drill a DN
182 core hole and the wall sleeve DN 160 with
styrofoam wedges to 1 to 2 % slope.
The condensate is drained via the external cover.
Recommendation: To prevent dirt from de-
positing on the façade around the external
cover, fit a water-repellent plaster system.
• Wall thickness
PP 45
, min. 265 mm.
• Wall thickness
PPB 30
, min. 320 mm.
•
PPB 30
: The slide-in unit (slide-in ex-
tension duct) must be appropriate for the wall
thickness, to avoid a ventilation short-circuit
(lack of air). To ensure this, shorten the exten-
sion duct accurately.
•
PPB 30
: With wall thicknesses of 500 to 790
mm, use the optional PP 45 VS extension kit.
When installing, use the centring ring provided
for the extension.
• Observe permissible ranges for radio-controlled
units → Technical data
PP 45
.
• Select installation position so as to avoid con-
tamination and draughts.
• Only connect
PP 45 O
units to
PP 45 LT
power
units.
• In case of thin walls, use the compensating
frame
PPB 30 ARE
(stainless steel) or
PPB 30
ARW
(white). This can be screwed to the wall
with the fixing plate
PPB 30 ARE BB
or
PPB 30
ARW BB
. Compensating frames (depth 55 mm)
are stackable. Only use stainless steel screws
when installing stainless steel compensating
frame covers.
Содержание PP 45 RHK
Страница 3: ...Steuerungskonzept PP 45 3 Steuerungskonzept PP 45...
Страница 4: ...Steuerungskonzept PPB 30 4 Steuerungskonzept PPB 30...
Страница 22: ...PP 45 control concept 22 PP 45 control concept...
Страница 23: ...PPB 30 control concept 23 PPB 30 control concept...
Страница 41: ...Concept de commande PP 45 41 Concept de commande PP 45...
Страница 42: ...Concept de commande PPB 30 42 Concept de commande PPB 30...
Страница 59: ...Notizen...