4. Safety instructions and warnings
7
In the event of a fire, there is a risk
of the fire spreading:
●
if an incorrect connection duct is
connected to the ER housing. Always use
the right duct material for the ER housing
chapter 10.1.
●
If an incorrect ceiling compound is used
for exhaust air systems with an
intermediate ceiling
(ceiling barrier
system)
. Ensure that the gap remaining
between the main duct and wall or ceiling
is fully sealed with non-flammable
materials resistant to deformation, such as
concrete, cement mortar or plaster.
5. Operating the fan
ER EC fans run
at 30 m³/h in base load
operation
(factory setting).
A light switch or separate switch can be used
to switch to
full load operation with 60 m³/h
.
The fan control is located in the cover: ER-
AK, ER-AH and ER-AB have automatic
functions with unit parameters that can be set
chapter 6.4.
●
ER-A
: Standard model
●
ER-AK:
Comfort model
●
ER-AH:
Model with humidity control,
barrier-free
●
ER-AB:
Model with motion sensor, barrier-
free
For full load operation, a
start delay
of 60
seconds and an
overrun time
of 15 minutes
are specified
at the factory
.
If the fan is switched on and off
manually, function in accordance
with DIN 18017-3 is not always
ensured.
Ensure sufficient supply air during
operation.
6. System and product information
6.1 Certificates of approval
Certificates of approval are available
on request or on our website
www.maico-ventilatoren.com. The
approval number can be seen on the
TÜV sticker/conformity mark
③
(TÜV
German Technical Inspection Agency).
6.2 Installation conditions
If installed in accordance with DIN 18017-3,
use is only permitted:
●
in single air extraction systems with a
shared main duct;
●
with an air supply via shaft or duct;
●
with permitted connection ducts;
●
with the ER EC housing suited to the
system;
●
with recess installation in the wall or
ceiling;
●
if correctly installed as per the instructions
in this manual and the general building
approval;
●
with sufficient space from the wall or
ceiling;
●
if unit is completely installed;
●
with the correct air filters;
●
with the outside air openings stated in the
planning documents.
If the installation deviates from DIN 18017-3:
●
ER EC fans can also be used as
standalone units.
●
Installation in the wall or ceiling is
permitted.
●
The extraction of an additional room (open
plan kitchen) or a toilet seat air extraction.