19. Wiring diagrams
30
19. Wiring diagrams
Tolerances for the stated
times = nominal value ± 5 %
Connection variants, base load/full load
for ER-A, ER-AK, ER-AH and ER-AB
Nominal load
can be switched
Connection variants for interval,
humidity, movement for ER-AK,
ER-AH, ER-AB
‒ Not for ER
-
A ‒
Values that can be set with optional cover
with integrated electronics:
●
ER-AK, ER-AH, ER-AB
:
Start delay and
overrun time
●
ER-AH: Humidity control
●
ER-AH: Motion detector
For ER-A cover
●
Start delay of 60 seconds
●
Overrun time of 15 minutes.
Nominal load can be
switched with
permanent base load
Base and nominal load
can be switched
Motor control
Motor control
Motor control
Motor control
Содержание ER GH
Страница 2: ...2 1 ...
Страница 31: ...31 ...