10. Mounting preparations
16
4. Correctly attach main ventilation duct [14]
inside the shaft.
5. Fit ceiling compound for fire protection
systems. To do this, encase the ceiling
and pour in the material from above.
6. Fit duct attachments to ceiling (
Fig. 5).
Only use permitted mounting material.
DANGER
Risk of incorrect installation if non-
permitted mounting material is used.
Only secure connection duct to ceiling with
permitted mounting material (duct clamp or
clamping band).
7. Connect permitted connection duct [15] to
main duct and seal for ventilation, for
example with cold-shrink tape.
8. Apply wall/board compound [24]. Seal gap
between brickwork and folded spiral-
seams duct. The gap remaining must be
fully sealed with non-flammable materials
resistant to deformation. For example, use
concrete or cement mortar, for wall boards
use fire protection filler.
9. Fit suspended ceiling. Use ER GH housings
to ensure a suitable, flat surface so that
the fan insert can be safely inserted in the
housing later on.
10. Lay power cable [16] in line with chapter
10.4.
10.4 Preparations for the electrical
connection
●
Always note the relevant specifications
for electrical installations and when fitting
equipment. In Germany observe DIN VDE
0100 and the corresponding parts in
particular.
●
Observe ambient conditions (
chapter 7)
and technical data (
chapter 8).
●
Note permitted duct cross-section of
max. 1.5 mm².
1. Lay power cable to the installation
location.
2. Continue with safety check of trigger
equipment according to chapter 10.5.
10.5 Preparing the shutter
NOTICE
If the installation position is wrong, the
plastic shutter [3] will not close tightly.
Odours may then escape from the
ventilation channel.
Insert shutter [3] to
top/to the right/to the left/to rear in exhaust
socket [2] of the ER GH housing to fit the
installation position, Ensure that the shutter
closes fully sealed.
Before fitting housing, it is essential
that the position of the shutter is
checked and its function ensured.
For wall installation with air outlet
direction (exhaust socket) to the
left
or
right
, install the shutter [3] rotated
by 90°
following figures.