Maico ECA 100 ipro RC Скачать руководство пользователя страница 22

EN

 

 

20 

This humidity is saved as the first reference 
value. No further manual setting of a refe-
rence value is necessary.  

If the relative humidity drops directly following 
the installation, this is saved as the new refe-
rence value. The lowest possible reference 
value is 48 % relative air humidity. 

If the room humidity increases by 7 %, the 
fan switches on automatically at performance 
level 1 (78 m³/h). 
●  If the room humidity increases even 

further, the unit switches to performance 
level 2 (92 m³/h). 

●  If there are no further increases, the unit 

continues to run at performance level 1 
(78 m³/h) until the humidity again falls 
below the saved reference value. 

If humidity falls below the reference value, 
the performance level is also throttled back. 
●  If an RLS RC is deployed, operation is 

done in line with the setting at the RLS RC. 

●  In the case of operation without an RLS RC 

(individual unit), the unit switches back to 
the last performance level to have been 
active before humidity operation. 

The currently prevailing room humidity is 
saved as the new reference value. A new 
reference value is also saved if the radio 
switch is operated during humidity operation. 

 

3.5 Further radio components 

3.5.1 

DS RC radio switch 

(EnOcean switch)

 

Fan with a radio switch in individual 
operation 

●  Radio switch, (double-rocker switch) for 

setting different fan performance levels. 

●  Press the rocker switch to switch up or 

down one performance level. 

The left and right rocker have to be 
set up separately: Left rocker for 
on/off, right rocker to switch the 
performance level up and down. 

Always set up the radio switch for the 
fan that is located in the same room 
as the switch. 

Fan with several radio switches in 
individual operation 

Function as described above. Up to 5 radio 
switches can be set up per fan. 

 

Radio switches in master/slave network 

The ventilation system is operated as 
per the settings made at the RLS RC. 
However, every switching action 
made by radio switch has priority over 
the RLS RC setting. 

●  If a radio switch is operated, the assigned 

fan switches to the manually selected 
performance level. 

●  After 30 minutes of the switch not being 

operated (timeout), the unit returns to the 
setting according to RLS RC. If the setting 
is changed at the RLS RC during the 
timeout, the assigned fan only reacts to this 
command once the timeout has elapsed. 

●  In the case of the RCH version, the auto-

matic humidity function has priority when 
operating in vacation mode. Switching 
through the DS RC or through a radio 
window contact is possible during humidity 
operation. 

 

3.5.2 Radio window contact 

(EnOcean switch)

 

●  A maximum of 2 radio window contacts can 

be taught-in for each fan. 

●  The radio window contact sends the 

"Window open" or "Window closed" status 
to the assigned fan. 

●  The assigned fan switches off 

automatically if the window is opened. 

●  If you want the fan to continue to operate 

even when the window is open, it can be 
switched on with the assigned radio switch. 

●  The radio switch has priority over the radio 

window contact and/or the RLS RC. 

●  The fan either switches off again after a 

timeout of approx. 30 minutes if the window 
is still open or back to the operation mode 
set through the RLS RC if the window is 
closed. 

Содержание ECA 100 ipro RC

Страница 1: ...leitung Kleinraumventilatoren Mounting and Operating instructions Small room fans Instructions de montage et Mode d emploi A rateurs pour petites pi ces ECA 100 ipro RC ECA 100 ipro RCH www maico v en...

Страница 2: ...n a master fan ECA 100 ipro RC or ECA 100 ipro RCH Max 2 slave fans 1 RLS RC radio control for the master slave operation Max 5 radio switches 5 operating locations Max 2 radio window contacts Connect...

Страница 3: ...B C A...

Страница 4: ...f r den Betrieb 7 6 3 Zuluftnachstr mung innerhalb der Wohnung 8 7 Montagevorbereitungen 8 8 Montage 9 8 1 Geh useeinbau 9 8 2 Elektrischer Anschluss 9 8 3 Inbetriebnahme 10 9 Funkteilnehmer einlernen...

Страница 5: ...en Bewahren Sie diese Anleitung f r einen sp teren Gebrauch gut auf 2 1 Installationspersonal Die Montage ist nur durch Fachkr fte mit Kenntnissen und Erfahrungen in der L ftungstechnik zul ssig Der e...

Страница 6: ...pf nger sind ECA 100 ipro Ventilato ren der Ger teausf hrungen RC und RCH Sender sind Systemkomponenten wie die Raumluftsteuerung RLS RC der Funk schalter DS RC Funk Fensterkontakte und weitere ECA 10...

Страница 7: ...Wippe f r Ein Aus rechte Wippe um die Leistungsstufe hoch herunter zuschalten Funkschalter immer an dem im selben Raum befindlichen Ventilator einlernen Ventilator mit mehreren Funkschaltern im Einzel...

Страница 8: ...nnen diese Werte berschritten werden In diesem Fall sind zus tzliche Entst rma nahmen erforder lich L C oder RC Glieder Schutzdioden Varistoren Bestimmungen f r den Betrieb mit Feuerst tten Bei Betri...

Страница 9: ...Ger t sind nicht zul ssig und entbinden den Hersteller von jeglicher Gew hrleistung und Haftung 6 2 Sicheres und korrektes Verhalten f r den Betrieb Verletzungsgefahr durch Gegenst nde im Fl gel rad K...

Страница 10: ...ei der Elektroinstallation und Ger te montage unbedingt die einschl gigen Vorschriften beachten in Deutschland insbesondere DIN VDE 0100 mit den entsprechenden Teilen Netzleitung Unterputz bis an den...

Страница 11: ...ebauter Leitungst lle Kappe der Leitungst lle 3 so abschneiden dass die Leitungs t lle die Netzleitung dicht umschlie t Dabei die Kappe max 5 mm abschneiden Netz leitung l sst sich besser biegen und E...

Страница 12: ...kabdeckung an beiden Positionen PRESS fest in das Geh use dr cken Bei Ger teausf hrungen RCH mitgeliefer 7 ten Sensor 9 lagerichtig Pfeile X in den Anschlusssockel einstecken Abdeckung 6 anbringen 8 D...

Страница 13: ...Empf ngt der Master oder Slave Ventilator ein g ltiges Einlerntelegramm von einem noch nicht eingelernten Ger t werden die Daten ausgewertet und gespeichert Ist das Ger t bereits eingelernt wird das E...

Страница 14: ...rd gesendet Bei erfolgreichem Einlernen leuchtet die LED ca 1 Sekunde Bei fehlerhafter bertragung blinkt die Tasten LED 3 mal kurz Am Empf nger Ventilator den Einlern 5 modus erneut aktivieren Die rec...

Страница 15: ...am Ventilator 1 mal kurz aufleuchtet Alle eingelernten Sender sind nun gel scht Der Ventilator befindet sich wieder im Grundzustand 9 7 Ventilator als Signalverst rker einstellen Repeater Die im Vent...

Страница 16: ...Spannung Netzsicherung ausschalten ACHTUNG Ger tebesch digung bei falschem Reinigungsmittel Abdeckung 6 und Design abdeckung 7 nur mit Wasser reinigen Keine aggressiven Reinigungsmittel verwenden Inne...

Страница 17: ...stt tig wieder ein Ventilator reagiert nicht auf Funk Befehle Ursache Abhilfe Ventilatoren sind nicht korrekt eingelernt Sender aller Kom ponenten l schen Delete Modus Kapitel 9 6 Sender an der RLS RC...

Страница 18: ...eils wiederver wertbare Stoffe teils Substanzen die nicht in den Restm ll gelangen d rfen Entsorgen Sie das Ger t nach Ablauf seiner Lebensdauer nach den in Ihrem Land geltenden Umweltrichtlinien und...

Страница 19: ...Installation preparations 23 8 Mounting 24 8 1 Housinginstallation 24 8 2 Electrical connection 24 8 3 Commissioning 25 9 Setting up or deleting radio devices 26 9 1 Program levels 26 9 2 Teaching in...

Страница 20: ...fan for the first time Follow the instructions Keep these instructions safe for use later on 2 1 Installation staff Installation may only be carried out by specialists who have the necessary knowledge...

Страница 21: ...co Smart with ECA100 ipro units Receivers are ECA 100 ipro fans from the RC and RCH unit models Transmitters are system components such as RLS RC room air control DS RC radio switches radio window con...

Страница 22: ...ht rocker to switch the performance level up and down Always set up the radio switch for the fan that is located in the same room as the switch Fan with several radio switches in individual operation...

Страница 23: ...exceeded when operating with fluorescent tubes In this case additional interference suppression measures L C components or RC module protection diodes varistors are required Regulations for operation...

Страница 24: ...alterations to the unit are not permitted and release the manufacturer from any guarantee and liability 6 2 Safe and correct practices during operation Danger of injury from objects in the impeller D...

Страница 25: ...levant specifica tions for electrical installations and when installing equipment In Germany particular attention must be paid to the DIN VDE 0100 and the corresponding parts Lay power cable recessed...

Страница 26: ...that the cable grommet fits tightly round the power cable Cut a maximum of 5 mm off the cap power cable can bend better and electronics cover 4 can be positioned correctly Fit cable grommet 3 correct...

Страница 27: ...addition press the electronics cover firmly on to the housing at the points indicated by the word PRESS With RCH unit models plug the supplied 7 sensor 9 correctly arrow X into the connector sockets F...

Страница 28: ...e telegram If the master or slave fan receives a valid teach in telegram from a unit that has not yet been set up the data is evaluated and stored If the device has already been taught in the teach in...

Страница 29: ...sent If teaching in is completed successfully the LED lights up for approx 1 second If transfer was faulty the button LED flashes briefly 3 times Re activate teach in mode at the receiver 5 fan Press...

Страница 30: ...an 1 second until the LED on the fan lights up briefly once All transmitters that have been set up are now deleted The fan is again in its initial state 9 7 Setting up the fan as a signal amplifier Re...

Страница 31: ...is powered up Switch the mains fuse off NOTICE Risk of damage to unit if incorrect cleaning agent is used Only use water to clean cover 6 and designer cover 7 Do not use aggressive cleaning agents On...

Страница 32: ...minutes Unit switches back on automatically after cooling down Fan doesn t react to radio commands Cause Remedy Fans are not correctly set up Delete all component transmitters Delete mode Chapter 9 6...

Страница 33: ...an be recycled and in part substances that should not end up as domestic waste Once it has reached the end of its working life dispose of the unit according to the environmental guidelines and specifi...

Страница 34: ...9 8 1 Montage dubo tier 39 8 2 Branchement lectrique 40 8 3 Mise en service 41 9 Initialisation ou effacement des parties prenantes au r seau radio 42 9 1 Niveaux de programme 42 9 2 Conseils pour l i...

Страница 35: ...utilisa tion de l a rateur Suivez les instructions Conservez ces instructions pour une utilisation ult rieure 2 1 Installateurs Seul un personnel qualifi disposant de connaissances et d exp rience dan...

Страница 36: ...ents de commande proximit d une douche pas de protection contre les projections d eau 3 4 Description du syst me Maico smart R seau avec lectronique radio cf page rabattable Maico Smart avec appareils...

Страница 37: ...actionnement de l interrupteur radio en mode Humidit entra ne galement l enregistrement d une nouvelle valeur de r f rence 3 5 Autres composants radio 3 5 1 Interrupteur radio DS RC Interrupteur EnOc...

Страница 38: ...r intervalle Sur tous les a rateurs la commutation Marche Arr t s effectue intervalle de 30 minutes protection contre l humidit Les ordres radio d autres parties prenantes au r seau radio sont ignor s...

Страница 39: ...mode d emploi Montage et branchement lectrique doivent exclusive ment tre effectu s par des sp cialistes selon les instruc tions du chapitre 2 1 Brancher exclusivement l ap pareil sur une installatio...

Страница 40: ...uer avec l appa reil Les enfants sans surveillance ne doivent pas nettoyer l appareil ou proc der des travaux d entretien revenant l utilisateur 6 3 Arriv e d air l int rieur du logement La circulatio...

Страница 41: ...condensats dans la colonne montante Effectuer les pr paratifs de montage comme d crits sous mur Gaine ronde barber les bords de l int rieur de la 1 gaine Effectuer les pr paratifs de montage 2 comme...

Страница 42: ...n utilis s Lors de l installation lectrique et du montage de l appareil respecter imp rativement les directives applicables et pour l Allemagne plus particuli rement la norme DIN VDE 0100 et les parti...

Страница 43: ...ieu la 2 commande d air ambiant RLS RC puis les interrupteurs radio et ou les contacts de fen tres radio conform ment au chap 9 Initialiser les autres composants du 3 syst me Effectuer un test de fonc...

Страница 44: ...t confirm par ce dernier Si l a rateur ma tre ou esclave re oit un t l gramme d initialisation valide d un appareil qui n a pas encore t initialis les valeurs sont analys es et m moris es Si l apparei...

Страница 45: ...nts brefs de la LED Sur le r cepteur a rateur activer de 3 nouveau le mode Initialisation Sur l interrupteur radio appuyer 3 fois 4 sur la bascule gauche en l espace de 2 secondes Le t l gramme d init...

Страница 46: ...Pour effacer l metteur souhait l op 1 ration d initialisation de l metteur RLS RC interrupteur radio ou contact de fen tre doit tre r p t e cf chapitre 9 5 Effacement de tous les metteurs Activer le...

Страница 47: ...ect s aux diff rents niveaux du syst me RLS RC Niveau de puissance 1 78 m h Niveau de puissance 2 92 m h indications pour soufflage libre S lection du programme Programme Taille du logement P1 30 m 50...

Страница 48: ...s de nettoyage agressifs Nettoyer les pi ces int rieures de l a ra 1 teur uniquement avec un chiffon sec Si le cache design 7 est tr s sale le 2 d poser avec pr caution cf page rabattable Fig B et le...

Страница 49: ...a rateur situ proximit En cas de port e trop r duite utiliser un r p teur Repeater suppl mentaire sur site 14 D montage DANGER Danger de mort par lectro cution Seul un lectricien qualifi peut se char...

Страница 50: ...48 Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Germany Service 49 7720 694 447 technik maico de 0185 1148 0000_RLF 3_01 15_DSW 01 15_Es...

Отзывы: