Maico Centro-M-APB Скачать руководство пользователя страница 13

9 Housing installation

13

With metal exhaust socket and metal shut-off
shutter and soldered strut with soldered strut lock-
ing device. This is approved for a PAM-GLOBAL
RML cast iron ventilation duct system or a system
with a fire-proof shaft.
It is essential to observe the permissible installa-
tion positions: 

Permitted installation positions:

[

}

 9]

.

6

Lower part of housing

10.1

Metal exhaust socket

10.2

Metal shut-off shutter

10.3

Retaining bolt

10.2.1

Soldered strut

10.2.2

Yoke spring

 DANGER Danger to life due to fire trans-

mission if the tab of the metal backflow pre-
venter is incorrectly screwed on.

It is essential to fasten the metal backflow pre-
venter and tab to the wall/ceiling with a suitable
screw and metal dowel.
Fixing screw is to be provided by the customer.

 DANGER For connection outside the

shaft: Danger to life due to fire transmission if
the metal exhaust socket is incorrectly con-
nected to the connection duct.

Make the connection in accordance with these in-
structions and the general building approval.
3 steel blind rivets are prescribed for the connec-
tion with the connection socket. These must not
impair the shutter function.
Before commissioning, ensure that the shut-off
shutter moves with ease.

NOTICE The metal shut-off device is perman-
ently closed if there is no soldered strut.

Check that the soldered strut is in the correct
place before installation.

NOTICE Unpleasant smells from the main
duct. Shut-off device does not close tightly in
cases of improper installation.

Before mounting, check the correct installation
position and check that the shut-off shutter func-
tions.

When installing on ceiling: Prepare metal
shut-off device for upwards air outlet direction

1. When shut-off device is inserted, remove yoke

spring. To do this, use pliers to pull yoke
spring out of exhaust socket from above.

2. Check and ensure that shut-off shutter is fully

functional.

9 Housing installation

9.1 Wall installation, lower part of housing

Содержание Centro-M-APB

Страница 1: ...Installation and operating instructions Surface mounted system for centralised ventilation in ac cordance with DIN 18017 3 Centro M APB Centro E APB Centro H APB www maico ventilatoren com...

Страница 2: ...preparations 9 8 1 Requirements in line with approval 9 8 1 1 Approval provisions 9 8 2 Permitted installation positions 9 8 3 Preparations for installation with fire protection requirements 10 8 3 1...

Страница 3: ...3 Preface Please read the instructions carefully before in stalling and using for the first time Follow the in structions Pass these instructions on to the owner for safekeeping Overview of Centro APB...

Страница 4: ...ci ated with electricity on the basis of your technical training and experience 3 Intended use Centro APB exhaust air elements are intended for use in central ventilation systems with a common main du...

Страница 5: ...shock If the unit is open all off the supply circuits must be switched off mains fuse off secured against being accidentally switched back on and a visible warning sign must be attached Only operate t...

Страница 6: ...mulate harmful substances mould germs etc This may also happen if the unit is shut down for an extended period If the air filter is missing the unit and air ducts become soiled Never operate the unit...

Страница 7: ...y relative humidity This hu midity value is saved as the first reference value The reference value does not have to be spe cified manually If the room humidity rises by 7 within 2 minutes the exhaust...

Страница 8: ...ch the air is to be extracted must be fitted with a non closable free supply air cross section of at least 150 cm e g with MLK door ventilation grille Centro E APB and Centro H APB with resist ance to...

Страница 9: ...duct between the main duct in the shaft and the unit max 2 m long ap proval Duct elbows in the unit con nection duct Max 90 bend ascending Number of duct elbows permit ted for wall installation Max 1...

Страница 10: ...DANGER Danger to life due to fire trans mission in case of faulty ceiling compound It is essential that the remaining gap between the main duct and the wall or ceiling is completely sealed with non fl...

Страница 11: ...r bolt steel dowel 27 2 Metal expansion dowel 28 Retaining bolt with nut 29 Retaining bolt 30 Steel clamping band Keep a maximum distance of 1 5 m between the duct fastenings It is essential to observ...

Страница 12: ...mmable materials that are resistant to de formation For example use concrete or ce ment mortar or for wall boards use fire protec tion filler 7 Fasten duct bends with 3 steel screws or 3 steel blind r...

Страница 13: ...socket is incorrectly con nected to the connection duct Make the connection in accordance with these in structions and the general building approval 3 steel blind rivets are prescribed for the connec...

Страница 14: ...It is es sential that the permissible installation posi tions are observed 3 Drill fixing holes and insert dowels Suitable mounting material is to be provided by the customer 4 Check ease of movement...

Страница 15: ...r rectly all the way round 10 Slide connection duct up to stop above ex haust socket Connection between connection duct and exhaust socket must be leak tight use cold shrink tape for example Prescribe...

Страница 16: ...of incorrect installation if non permitted mounting material is used Only secure connection duct to ceiling with per mitted mounting material duct clamp or clamping band Prescribed mounting material...

Страница 17: ...ning sign DANGER Danger from electric shock The unit will be damaged if installed incorrectly with too long a power cable If the cable feed is too long inside the housing the fan insert cannot be inst...

Страница 18: ...PB with fixed air volume setting for basic ventilation 8 Sealing 10 2 Shut off shutter 36 38 Locking tabs 37 Locking lever 2 Switch off mains fuse and fit warning sign 3 Check ease of movement of shut...

Страница 19: ...n A all the way The red dye in the interior of the bar B is released The bar indicator first fills slightly Within the next 6 months the bar indicator B will rise to the upper edge indicator value 6 1...

Страница 20: ...ocking tabs 37 Locking lever 38 Locking tabs 1 Switch off mains fuse secure and fit warning sign 2 Remove cover and upper part of housing 3 Press locking lever slightly to the left arrow I release and...

Страница 21: ...o not connect addi tional consumers to ter minal 4 The unit may only be connected according to the wiring diagrams Wiring diagrams 22 If the fault persists or reoccurs Disconnect the unit completely f...

Страница 22: ...estic waste Dispose of the packaging material in an environ mentally friendly way in compliance with the reg ulations valid in the country where you are Dispose of the air filter in an environmentally...

Страница 23: ...erence value does not have to be specified manually If the room humidity rises by 7 within 2 minutes the exhaust air element switches to full load operation demand based ventilation If the relative hu...

Страница 24: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D11 21_EN_DSW AV...

Отзывы: