8 Mounting preparations

12

 DANGER Danger to life due to fire trans-

mission in case of faulty ceiling compound.

It is essential that the remaining gap between the
main duct and the wall or ceiling is completely
sealed with non-flammable materials that are res-
istant to deformation. For example, use concrete
or cement mortar.

 DANGER Danger to life due to fire trans-

mission if not flush with the brickwork or with
panel building materials.

If used outside the shaft, seal the gap remaining
between the connection duct and brickwork/wall
boards with non-flammable materials resistant to
deformation.
For example, use concrete or cement mortar for
brickwork or special fire protection filler for wall
boards.

NOTICE Damage to unit, malfunctioning in the
event of corrosion damage from mortar.

Wrap ventilation ducts, connected to the unit,
with a suitable adhesive tape to protect against
corrosion inside the brickwork, e.g. using cold-
shrink tape.

Procedure

It is essential to observe the installation in-
structions: 
Mounting preparations [

}

 9]

.

1. Correctly attach main duct inside the shaft.

2. Apply ceiling compound. To do this, encase

the ceiling and pour in the material from
above.

3. Make shaft opening for the DN 80 steel folded

spiral-seams duct.

4. Fit duct attachments to the ceiling. Only use

permitted, suitable mounting material.

5. Connect DN 80 steel folded spiral-seams duct

to main duct and seal for ventilation, for ex-
ample with cold-shrink tape.

6. Apply brickwork compound. Seal gap between

brickwork and folded spiral-seams duct. The
gap remaining must be fully sealed with non-
flammable materials that are resistant to de-
formation. For example, use concrete or ce-
ment mortar or for wall boards, use fire protec-
tion filler.

7. Fasten duct bends with 3 steel screws or 3

steel blind rivets.

8. Make the DN 80 opening for the unit connec-

tion socket in the suspended ceiling (fire res-
istance is not required). It is essential to ob-
serve the permissible installation positions:
Permissible installation positions for AP and
APB fans.

9. Attach the suspended ceiling and provide a

suitable, level substructure.

It is imperative to compensate any uneven-
ness in the wall or ceiling so that the lower
part of the housing can be installed without
warping. Otherwise it may be that the fan
insert can no longer be inserted into the
lower part of the housing or that the de-
gree of protection indicated on the rating
plate is no longer guaranteed.

10.Attach spigot made from shaft material F90

around the shaft.

The spigot compensates for the length of
the shaft walls in the event of a fire.

11.Continue with the safety-related test of the

shut-off device: 

Safety instructions for installa-

tion of the fire protection shut-off device
[

}

 12]

.

8.4 Preparations for the electrical
connection

 DANGER Danger to life from electric

shock.

Before laying the power cable, switch off all sup-
ply circuits. Switch off mains fuse, secure against
being accidentally switched back on and position
a visible warning sign.

Always note the relevant specifications for
electrical installations and when fitting
equipment. In Germany, observe DIN VDE
0100 and the corresponding parts in partic-
ular.

1. Lay power cable to the installation location.

8.5 Safety instructions for installation
of the fire protection shut-off device

Maintenance-free fire protection shut-off device
against fire transmission.

Содержание Centro-M-APB

Страница 1: ...Installation and operating instructions Surface mounted system for centralised ventilation in ac cordance with DIN 18017 3 Centro M APB Centro E APB Centro H APB www maico ventilatoren com...

Страница 2: ...preparations 9 8 1 Requirements in line with approval 9 8 1 1 Approval provisions 9 8 2 Permitted installation positions 9 8 3 Preparations for installation with fire protection requirements 10 8 3 1...

Страница 3: ...3 Preface Please read the instructions carefully before in stalling and using for the first time Follow the in structions Pass these instructions on to the owner for safekeeping Overview of Centro APB...

Страница 4: ...ci ated with electricity on the basis of your technical training and experience 3 Intended use Centro APB exhaust air elements are intended for use in central ventilation systems with a common main du...

Страница 5: ...shock If the unit is open all off the supply circuits must be switched off mains fuse off secured against being accidentally switched back on and a visible warning sign must be attached Only operate t...

Страница 6: ...mulate harmful substances mould germs etc This may also happen if the unit is shut down for an extended period If the air filter is missing the unit and air ducts become soiled Never operate the unit...

Страница 7: ...y relative humidity This hu midity value is saved as the first reference value The reference value does not have to be spe cified manually If the room humidity rises by 7 within 2 minutes the exhaust...

Страница 8: ...ch the air is to be extracted must be fitted with a non closable free supply air cross section of at least 150 cm e g with MLK door ventilation grille Centro E APB and Centro H APB with resist ance to...

Страница 9: ...duct between the main duct in the shaft and the unit max 2 m long ap proval Duct elbows in the unit con nection duct Max 90 bend ascending Number of duct elbows permit ted for wall installation Max 1...

Страница 10: ...DANGER Danger to life due to fire trans mission in case of faulty ceiling compound It is essential that the remaining gap between the main duct and the wall or ceiling is completely sealed with non fl...

Страница 11: ...r bolt steel dowel 27 2 Metal expansion dowel 28 Retaining bolt with nut 29 Retaining bolt 30 Steel clamping band Keep a maximum distance of 1 5 m between the duct fastenings It is essential to observ...

Страница 12: ...mmable materials that are resistant to de formation For example use concrete or ce ment mortar or for wall boards use fire protec tion filler 7 Fasten duct bends with 3 steel screws or 3 steel blind r...

Страница 13: ...socket is incorrectly con nected to the connection duct Make the connection in accordance with these in structions and the general building approval 3 steel blind rivets are prescribed for the connec...

Страница 14: ...It is es sential that the permissible installation posi tions are observed 3 Drill fixing holes and insert dowels Suitable mounting material is to be provided by the customer 4 Check ease of movement...

Страница 15: ...r rectly all the way round 10 Slide connection duct up to stop above ex haust socket Connection between connection duct and exhaust socket must be leak tight use cold shrink tape for example Prescribe...

Страница 16: ...of incorrect installation if non permitted mounting material is used Only secure connection duct to ceiling with per mitted mounting material duct clamp or clamping band Prescribed mounting material...

Страница 17: ...ning sign DANGER Danger from electric shock The unit will be damaged if installed incorrectly with too long a power cable If the cable feed is too long inside the housing the fan insert cannot be inst...

Страница 18: ...PB with fixed air volume setting for basic ventilation 8 Sealing 10 2 Shut off shutter 36 38 Locking tabs 37 Locking lever 2 Switch off mains fuse and fit warning sign 3 Check ease of movement of shut...

Страница 19: ...n A all the way The red dye in the interior of the bar B is released The bar indicator first fills slightly Within the next 6 months the bar indicator B will rise to the upper edge indicator value 6 1...

Страница 20: ...ocking tabs 37 Locking lever 38 Locking tabs 1 Switch off mains fuse secure and fit warning sign 2 Remove cover and upper part of housing 3 Press locking lever slightly to the left arrow I release and...

Страница 21: ...o not connect addi tional consumers to ter minal 4 The unit may only be connected according to the wiring diagrams Wiring diagrams 22 If the fault persists or reoccurs Disconnect the unit completely f...

Страница 22: ...estic waste Dispose of the packaging material in an environ mentally friendly way in compliance with the reg ulations valid in the country where you are Dispose of the air filter in an environmentally...

Страница 23: ...erence value does not have to be specified manually If the room humidity rises by 7 within 2 minutes the exhaust air element switches to full load operation demand based ventilation If the relative hu...

Страница 24: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D11 21_EN_DSW AV...

Отзывы: