8 Mounting preparations

9

8 Mounting preparations

 Suitable mounting material is to be

provided by the customer.

8.1 Requirements in line with ap-
proval

8.1.1 Approval provisions

Approval provision

Centro-APB

Number of units per floor, res-
idential unit or fire zone

Max. 3

 fans or 3

connections

Shaft wall

min. 35 mm ,
board materials
(F90)

Connection ducts 

inside

 the

shaft

Steel folded
spiral-seams
duct

, between

the main duct in
the shaft and the
unit, max. 2 m
long (→ ap-
proval).

Duct elbows in the unit con-
nection duct

Max. 90° bend,
ascending

Number of duct elbows permit-
ted for wall installation

Max. 1 x 90°

Number of duct elbows permit-
ted for ceiling installation

Max. 2 x 90°

Regulating equipment in the
exhaust air duct

Not permitted

Wall/ceiling opening for DN 80
unit connection duct

Brickwork or
concrete: 130
mm.

Board materials
(F90): Outer Ø
of pipe

8.2 Permitted installation positions:

Wall installation, top left corner of room

Wall installation, top right corner of room

Ceiling installation

Содержание Centro-E-APB

Страница 1: ...Installation and operating instructions Surface mounted system for centralised ventilation in ac cordance with DIN 18017 3 Centro M APB Centro E APB Centro H APB www maico ventilatoren com...

Страница 2: ...preparations 9 8 1 Requirements in line with approval 9 8 1 1 Approval provisions 9 8 2 Permitted installation positions 9 8 3 Preparations for installation with fire protection requirements 10 8 3 1...

Страница 3: ...3 Preface Please read the instructions carefully before in stalling and using for the first time Follow the in structions Pass these instructions on to the owner for safekeeping Overview of Centro APB...

Страница 4: ...ci ated with electricity on the basis of your technical training and experience 3 Intended use Centro APB exhaust air elements are intended for use in central ventilation systems with a common main du...

Страница 5: ...shock If the unit is open all off the supply circuits must be switched off mains fuse off secured against being accidentally switched back on and a visible warning sign must be attached Only operate t...

Страница 6: ...mulate harmful substances mould germs etc This may also happen if the unit is shut down for an extended period If the air filter is missing the unit and air ducts become soiled Never operate the unit...

Страница 7: ...y relative humidity This hu midity value is saved as the first reference value The reference value does not have to be spe cified manually If the room humidity rises by 7 within 2 minutes the exhaust...

Страница 8: ...ch the air is to be extracted must be fitted with a non closable free supply air cross section of at least 150 cm e g with MLK door ventilation grille Centro E APB and Centro H APB with resist ance to...

Страница 9: ...duct between the main duct in the shaft and the unit max 2 m long ap proval Duct elbows in the unit con nection duct Max 90 bend ascending Number of duct elbows permit ted for wall installation Max 1...

Страница 10: ...DANGER Danger to life due to fire trans mission in case of faulty ceiling compound It is essential that the remaining gap between the main duct and the wall or ceiling is completely sealed with non fl...

Страница 11: ...r bolt steel dowel 27 2 Metal expansion dowel 28 Retaining bolt with nut 29 Retaining bolt 30 Steel clamping band Keep a maximum distance of 1 5 m between the duct fastenings It is essential to observ...

Страница 12: ...mmable materials that are resistant to de formation For example use concrete or ce ment mortar or for wall boards use fire protec tion filler 7 Fasten duct bends with 3 steel screws or 3 steel blind r...

Страница 13: ...socket is incorrectly con nected to the connection duct Make the connection in accordance with these in structions and the general building approval 3 steel blind rivets are prescribed for the connec...

Страница 14: ...It is es sential that the permissible installation posi tions are observed 3 Drill fixing holes and insert dowels Suitable mounting material is to be provided by the customer 4 Check ease of movement...

Страница 15: ...r rectly all the way round 10 Slide connection duct up to stop above ex haust socket Connection between connection duct and exhaust socket must be leak tight use cold shrink tape for example Prescribe...

Страница 16: ...of incorrect installation if non permitted mounting material is used Only secure connection duct to ceiling with per mitted mounting material duct clamp or clamping band Prescribed mounting material...

Страница 17: ...ning sign DANGER Danger from electric shock The unit will be damaged if installed incorrectly with too long a power cable If the cable feed is too long inside the housing the fan insert cannot be inst...

Страница 18: ...PB with fixed air volume setting for basic ventilation 8 Sealing 10 2 Shut off shutter 36 38 Locking tabs 37 Locking lever 2 Switch off mains fuse and fit warning sign 3 Check ease of movement of shut...

Страница 19: ...n A all the way The red dye in the interior of the bar B is released The bar indicator first fills slightly Within the next 6 months the bar indicator B will rise to the upper edge indicator value 6 1...

Страница 20: ...ocking tabs 37 Locking lever 38 Locking tabs 1 Switch off mains fuse secure and fit warning sign 2 Remove cover and upper part of housing 3 Press locking lever slightly to the left arrow I release and...

Страница 21: ...o not connect addi tional consumers to ter minal 4 The unit may only be connected according to the wiring diagrams Wiring diagrams 22 If the fault persists or reoccurs Disconnect the unit completely f...

Страница 22: ...estic waste Dispose of the packaging material in an environ mentally friendly way in compliance with the reg ulations valid in the country where you are Dispose of the air filter in an environmentally...

Страница 23: ...erence value does not have to be specified manually If the room humidity rises by 7 within 2 minutes the exhaust air element switches to full load operation demand based ventilation If the relative hu...

Страница 24: ...Maico Elektroapparate Fabrik GmbH Steinbeisstr 20 78056 Villingen Schwenningen Deutschland Service 49 7720 6940 info maico de D11 21_EN_DSW AV...

Отзывы: