TWIN F 3.0 A / TWIN F 3.0 U
D1 5002BA1-GB01
26
INSTALLATION SURFACE OR HOLE
The lift must be placed on level floor and sufficiently resistant. The surface and
foundation must be suitable for bearing maximum stress values, also in unfavourable
working conditions. If in-ground/recessed installation is made (PSB 3IG model only), the
finished size of the hole must be verified (as per drawing sent at the time of order). For
installations on raised surface, compliance with the maximum carrying capacity of the
surface is recommended.
7.2 Runway assembly and control desk positioning
U
NAUTHORISED PERSONS ARE NOT ALLOWED TO ENTER DURING ASSEMBLY
•
Transport platforms to the installation site by using hoisting means with load
capacity of
500 kg
at least.
•
To prevent the platform from dropping during transport, it should be lifted
according to its centre of gravity.
•
Always raise platforms by holding them on the underside of the base frames.
•
Position the base frames on the foundation according to the drive-on direction
of the lift. (Align platforms parallel to each other and in the drive-on direction of
the lift).
•
Lift platforms with auxiliary equipment by using strong ropes, bands and chains
and insert the safety blocks supplied with the lift (Ref. Figure 15).
•
Place the control desk in the position provided for.
7.3 Hydraulic system connection
(Ref. Figure 16)
•
Connect hydraulic hose to the fittings placed on the fixed platforms referring to
the letters shown on them.
•
Tighten
thoroughly.
•
Connect hydraulic hoses to the fittings placed on the hydraulic unit referring to
the letters shown on them.
•
Tighten
thoroughly
Содержание Twin F 3.0 A
Страница 4: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 II...
Страница 6: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 IV...
Страница 8: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 VI...
Страница 10: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 VIII...
Страница 14: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 4...
Страница 19: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 9 Figure 2 LIFT...
Страница 21: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 11 Figure 3 CONTROL DESK...
Страница 34: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 24...
Страница 37: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 27 Figure 16 HYDRAULIC PIPES CONNECTION Platform 1 Platform 2...
Страница 45: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 35...
Страница 46: ...TWIN F 3 0 A TWIN F 3 0 U D1 5002BA1 GB01 36...
Страница 51: ......