background image

 
 
 
 
 
 

150331_IOM_GS_PE-LMD_BASIKA_rho_gb 

15 von 30 

 

8.2.2  Fully Automatic Disposal Device 

 
Key Assignment at the Control Panel 
 

 

Acknowledge 
General Fault 

 

 
 

Reserved 

 
 

 

Disposal 

 

ON / OFF 

 

 

Manual Pump 

 

ON / OFF 

 
Operational Sequence: 
 

  First of all the suction pipe needs to be connected firmly to the disposal car, e.g. by 

means of a B-coupling. 

 

  The disposal process is activated by pushing the button „Disposal ON-OFF“. The fully 

automatic programme control which operates in connection with the pressure sensor 
starts. 

 

  The agitators switch on automatically. The text display says “Stirring ON”. 

 

  After a programmed stirring time, depending on the nominal size, the disposal pump 

switches on automatically and the content of the container is pumped off into the 
disposal car. The text display says “Pump ON”. If the distance from the separator to 
the disposal car is quite long the device to accelerate the pump off process can now be 
activated at the disposal car.  

 

  The agitators switch off automatically. When the containers are completely empty the 

solenoid valve at the filling unit opens. Since the disposal pump continues to operate 
for a predefined time the fresh water flushes out any residues which are still in the 
sludge trap or grease separator.  

 

  As soon as the disposal pump switches off automatically the solenoid valve at the 

filling unit remains open for refilling purposes. The text display says “Solenoid Valve 
ON”.  
The disposal process is finished and the suction pipe connection (B-coupling) can be 
disconnected from the disposal car.  

 

  The pressure sensor indicates the container filling level „Full“, the solenoid valve 

closes and the plant is in „stand by“ mode until the next disposal process starts. 
 

Содержание BASIKA rho NS 2

Страница 1: ...Separator with integrated sludge trap made of Polyethylen PE LMD in oval design NS 2 4 7 5 10 Indoor installation in rooms protected from frost Installation Operating and Maintenance Instructions Subj...

Страница 2: ...or 6 2 6 Safety Instructions for Maintenance Inspection and Assembly Work 6 2 7 Modifications and Manufacture of Spare Parts on One s Own Authority 7 2 8 Illegal Operating Methods 7 3 Transportation 7...

Страница 3: ...hed 13 8 2 Disposal 13 8 2 1 Manual semi automatic disposal device 13 8 2 2 Fully automatic disposal device 15 8 3 Default settings for LOGO 17 23 9 Maintenance 24 25 10 Faults during Operation 26 Dec...

Страница 4: ...grease settlement in the inlet pipes they need to be laid with a slope of at least 2 1 50 and they should be easy to clean Technical regulations to be observed DIN 1986 draining plants for buildings a...

Страница 5: ...e of the system Not only that the general safety advice mentioned under the headline safety need to be followed but all other special safety advice given under other headlines as well 2 1 Identificati...

Страница 6: ...people are in danger because of electric mechanical and chemical impacts the environment is endangered because of leakage of hazardous substances 2 4 Safety conscious Working The safety advice the ex...

Страница 7: ...al Advice of the operating manual The limit values indicated in the data sheet may not be exceeded at all This installation and operating manual does not suspend any general prescriptions which are no...

Страница 8: ...ut opening the lid filling unit solenoid valve to refill the separator signalling unit max grease storage capacity reached 4 1 2 Fully Automatic Disposal Device Equipped with inspection window agitato...

Страница 9: ...ion pipe first of all the disposal pallet is erected horizontally and in flow direction the outlet suction connection points to the front Then the grease separator with the connection piece at the bot...

Страница 10: ...nance Prior to commissioning an expert needs to make sure that one of the necessary electric protective measures is available Grounding protective multiple earthing differential current switching etc...

Страница 11: ...st restart by means of a padlock Check whether the cover of the grease separator fits and is closed perfectly by means of the snap buckles clamping rings Check whole plant for tightness especially the...

Страница 12: ...release chlorine and should be used sparingly If they are used before entering the separator the separation effect may not be affected and they may not form stable emulsions EN 1825 2 According to EN...

Страница 13: ...l releases a message This message can also be retrieved in a potential free manner via an in house alarm signal processing system BMS GLT 8 2 Disposal of the Grease Separator Content 8 2 1 Manual semi...

Страница 14: ...eans that the disposal process is pending The display says Max Grease Storage Capacity Reached At the same time the in house alarm signal processing system BMS GLT is can be activated via a floating c...

Страница 15: ...l car The text display says Pump ON If the distance from the separator to the disposal car is quite long the device to accelerate the pump off process can now be activated at the disposal car The agit...

Страница 16: ...sal process is pending The display says Max Grease Storage Capacity Reached At the same time the in house alarm signal processing system BMS GLT is can be activated via a floating contact By pushing t...

Страница 17: ...ing deactivating summer winter time changeover in the programming operation mode 1 Switch LOGO to the programming operation mode 2 You are now in the main menu and want to pre select the Setup menu Ke...

Страница 18: ...mmer time in Europe UK is equivalent to the beginning and end of summer time in Great Britain US is equivalent to the beginning and end of summer time in the Unites States AUS is equivalent to the beg...

Страница 19: ...d of summer time Time difference AUS TAS First Sunday in October 02 00am 03 00am Last Sunday in March 03 00am 02 00am 60 min NZ First Sunday in October 02 00am 03 00am Third Sunday in March 03 00am 02...

Страница 20: ...ime 1 November and a time difference of 120 minutes two hours You can enter your data in the following manner Keys and move the cursor filled in square to and fro Keys and change the value at the curs...

Страница 21: ...y trigger actions From product line 0BA1 On re starting the clock is at Sunday 00 00 1 January The time remains as it is and flashes LOGO is in the state in which it was before the power supply was in...

Страница 22: ...he following display The cursor is at the weekday 8 Select the day of the week Keys or 9 Move the cursor to the next position Keys or 10 Change the value at the position Keys or 11 Set the clock to th...

Страница 23: ...he parameterization operation mode See Chapter 8 3 1 Item 1 2 Select in the Set parameterization menu Keys 3 Accept Set Key OK 4 Move the to Contrast Keys or 5 Accept Contrast Key OK LOGO reveals the...

Страница 24: ...st restart by a padlock 2 While the inside of the container is cleaned the suction pump at the disposal car needs to be switched on 3 Internal Cleaning of the Container open the container lid thorough...

Страница 25: ...of the grease separator is rubbed in with maintenance oil 10 Listing of required spare parts 11 Make a final report If you wish our after sales service to do the maintenance which will be charged sepa...

Страница 26: ...dge General Fault Pump A motor overload switch monitors continuously the power device of the pump In case of a failure the reason for the failure needs to be eliminated and the motor overload switch i...

Страница 27: ...to contact us if you have any questions or suggestions We always do our utmost to service you as good as possible MAGUS GmbH Am Westerbusch 63a 65 D 42111 Wuppertal Tel 49 202 7581920 Fax 49 202 7581...

Страница 28: ...150331_IOM_GS_PE LMD_BASIKA_rho_gb 28 von 30...

Страница 29: ...150331_IOM_GS_PE LMD_BASIKA_rho_gb 29 von 30...

Страница 30: ...150331_IOM_GS_PE LMD_BASIKA_rho_gb 30 von 30...

Отзывы: