MLS Clear Vu Features 

 

VACUUM UNIT: 

The ring compressor vacuum power unit is QUIET, RELIABLE, and LONG LASTING.  A 
single power unit supplies 8 stations, keeping costs low. 

 

POSITIVE OPERATION OF VALVES: 

All valves are positively operated by air cylinders.  There are no weighted flaps that 
might not close properly.  Valves close with a sliding action so "Static cling" pellets are 
wiped clear. 

 

STROBE LIGHT and audible ALARM: 

STROBE LIGHT and audible ALARM activate whenever a load cycle does not satisfy 
the sensor. 

 

STATION ALARMS: 

On total system power up, or after turning power on for a given station, the "alarm" 
function for that station is not active.  Filling the hopper for the first time, and covering 
the sensor, activates the "alarm" function for that station. 

 

After this "full hopper" initialization, the alarm will sound if the sensor is not immediately 
satisfied after a load cycle. 
 
Alarms may be selectively disabled for each station. 

 

ALARM SILENCE BUTTON: 

The silence button silences the alarm until any new event starts it up again.  The 
covering of the sensor of an alarming station will also silence the alarm, (unless another 
station is also in an alarm state). 

 

STATION TIMERS: 

Each receiver has a LOAD TIME associated with it.  Initial default load times are 10 
seconds and may be altered using the "SET LOAD TIME" button. 

 

SET TIMERS BUTTON: 

A TIMER button is provided as an input to the processor.  During any single load time, if 
the button is pressed, the loading time will continue to run until the button is released.  
When released, the station will stop loading immediately.  The time of release 
establishes the NEW load time for that station. 
 
One button serves to set times for all stations. 

 

FILTERLESS RECEIVERS: 

Individual receivers are filterless.  A central dust filter protects the blower unit.  This 
eliminates the need to service filters on top of hoppers and places the only filter in easy 
reach. 

 

EXPANDABLE UP TO 16 RECEIVERS: 

Your controller can control up to 8 receivers.  However, additional controller can be 
"linked" to your first controller using the Dual Controller Option, allowing up to 16 
receivers to operate off one single vacuum pump. 

Содержание MLS Clear Vu

Страница 1: ...RODUCTS INC MLS Clear Vu Model MLS Clear Vu Eight Component Vacuum Loading System INSTALLATION OPERATION MAINTENANCE Original Instructions Manual Revision Date March 31 2021 Copyright Maguire Products...

Страница 2: ...Maguire Products Inc 2 MLS Clear Vu...

Страница 3: ...ccepts no responsibility or liability for damage or malfunction of the equipment arising from non observance of these operating instructions To avoid errors and to ensure trouble free operation it is...

Страница 4: ...manual to be entirely accurate If you question any information in this manual or find errors please let us know so that we may make the required corrections or provide you with accurate information Ad...

Страница 5: ...aterial Mix 16 Receiver Load Time 16 Filter 16 2 4 Troubleshooting 18 2 5 Mechanical Adjustments 18 2 6 Setup Options Summary List 19 2 7 Setup Options Detailed Explanation 20 2 8 MLS Alarm Lights Exp...

Страница 6: ...ect wiring by others or installation or use not in accord with instructions furnished by Maguire Products Inc Our liability under this warranty will extend only to equipment that is returned to our fa...

Страница 7: ...each receiver are the only items that raise a safety concern The air cylinders exert a force of about 70 pounds on closing DO NOT reach into this area when cleaning the receiver or from below when cle...

Страница 8: ...uum and material line using 1 5 2 or 2 5 tubing steel aluminum or PVC and tees and elbows as required 1 RECEIVERS Mount receivers over the hopper compartments you wish to load Receivers are sized to f...

Страница 9: ...Maguire Products Inc 9 MLS Clear Vu...

Страница 10: ...Maguire Products Inc 10 MLS Clear Vu...

Страница 11: ...Maguire Products Inc 11 MLS Clear Vu...

Страница 12: ...Maguire Products Inc 12 MLS Clear Vu...

Страница 13: ...volt single phase blower motors have automatic overheat protection and will stop operating if they become too hot due to an inadequate power supply If you experience this problem read SETUP OPTIONS Ro...

Страница 14: ...and the power station both require air pressure to operate When mounted on a Weigh Scale Blender receivers can get their air supply from the extra pressure gauge port on the blender s air pressure reg...

Страница 15: ...acuum lines REMEMBER Performance is reduced by Inadequate diameter line Longer length lines Elbows and corrugated flex tubing Restrictions or neck down points Clogged filters Vacuum leaks LOADING BESI...

Страница 16: ...r if necessary Stations NOT connected to receivers will light but will NOT start the blower OPERATION 1 Turn power ON 2 Turn on each station you wish to load The controller will sequence through all s...

Страница 17: ...en filter The filter s in the power station traps all dust before it can reach the vacuum pump To check filter 1 Turn Controller power OFF to stop blower motor 2 Open the door on the front of the Filt...

Страница 18: ...T significantly reduce conveying rate Stations simply load more frequently 7 Excessive high vacuum will overheat the blower A thermal switch is provided in the exhaust air steam which trips out at 190...

Страница 19: ...ches 1 7 and 8 on designate Follower ROUTINE 3 Disable Enable Alarm Selected Stations Select Stations to ALARM Press SET TIMER ROUTINE 4 Delay the Retry Time Selected Stations Select Stations to chang...

Страница 20: ...n turn POWER ON Hold for 3 seconds while all lights blink rapidly Release when blinking stops Turn ON all stations you want to reset Turn OFF all stations you want unchanged Press and hold SET LOAD TI...

Страница 21: ...OFF all stations you do NOT want to alarm Press and hold SET LOAD TIME button for 1 second All lights will flash and then go off Release button to resume normal operation ROUTINE 4 Delay the retry tim...

Страница 22: ...he next time all stations are satisfied the blower will keep running This is due to anticipation that the blower will be called on again within the time period Therefore it is kept running By the same...

Страница 23: ...urn STATION 6 switch ON all others OFF While pressing SET LOAD TIME button turn POWER ON Hold for 3 seconds while all lights blink rapidly Release when blinking stops For switch numbers 1 2 3 4 5 6 7...

Страница 24: ...row 3478 This normally indicates that the filters are not installed properly Turn power off and fix the problem 2 After power has been turned on and filter circuit was present at anytime the filter c...

Страница 25: ...Maguire Products Inc 25 MLS Clear Vu MLS Alarm Lights Explained...

Страница 26: ...N This kit allows a dual MAIN FOLLOWER controller setup in which the customer can piggyback a second controller to their existing Maguire Loading System to allow a total of 16 receiver outputs Include...

Страница 27: ...ntil behind controller and still be connected to strobe light B Remove 2 screws fastening endplate to base C Remove 3 screws on bottom of base fastening front face to controller Tilt front face down f...

Страница 28: ...LLOW end of the DB9 cable supplied in the kit into the DB9 connector on the endplate D Reconnect the correct receiver cables to the back of the controller 8 Install FOLLOWER controller on right try A...

Страница 29: ...D Hold for 3 seconds while all lights blink rapidly E Release when blinking stops 10 To enter address of MAIN controller note that Main controller should already have this address A Turn ON switches...

Страница 30: ...2 Hex Nut 1 4 20 snn4 4 Nylok Nut 1 4 20 DESCRIPTION This kit allows a dual Main Follower controller setup in which the customer can piggyback a second controller to their existing Maguire Loading Sy...

Страница 31: ...til behind controller and still be connected to strobe light B Remove 2 screws fastening endplate to base C Remove 3 screws on bottom of base fastening front face to controller Tilt front face down fo...

Страница 32: ...2 20 Install MAIN controller on bottom tray A Plug power cord into motor starter box B Reconnect VACUUM MOTOR cord to connector in endplate C Plug in the YELLOW end of the DB9 cable supplied in the ki...

Страница 33: ...ld for 3 seconds while all lights blink rapidly E Release when blinking stops F Now go to 12 for Main or 13 for Follower 23 To enter address of MAIN controller note that main controller should already...

Страница 34: ...NCE BUTTON The silence button silences the alarm until any new event starts it up again The covering of the sensor of an alarming station will also silence the alarm unless another station is also in...

Страница 35: ...Maguire Products Inc 35 MLS Clear Vu...

Страница 36: ...Maguire Products Inc 36 MLS Clear Vu...

Страница 37: ...Maguire Products Inc 37 MLS Clear Vu...

Страница 38: ...610 459 2700 Email info maguire com Web www maguire com Maguire Europe Tame Park Tamworth Staffordshire B775DY UK Tel 44 1827 265 850 Fax 44 1827 265 855 Email info maguire europe com Maguire Product...

Отзывы: